WRUSHALI PUNWATKAR CIUL ENGINEER Plot No.490, Ashirwad Nagar, Nagpur - 440024. M. No. 9588414335, Maillwrushiiipunwatkar@omail.com FORM-2 [see Regulation 3] ENGINEER'S CERTIFICATE Dale.15 4.2025 To M/S. M.KULKARNI BUILDERS and INFRASTRUCTURE PVT.LTD ,I68, CHHATRAPATI NAGAR, NAGPUR, Subject: Certificate of Percentage of Completion of Construction Work of MK- ALTAMOUNT APARTMENTS No. of Building(s)/-ONE Wing(s) of the ONE Phase of the Project [P50500051101- MahaRERA Registration Numberl situate on the Plot bearing 9038, KH. NO. 45, CTS. NC. 124, SHEET NO. (25X9-11, HOUSE NO. 350/A/8, MZ-.LENDRA, KHARE TOWN and P. NO.393/A, KH. NO. 172, CTS NO 12312, SHEET NO. 25119, NMC HOUSE NO. 349, MZ. LENDRA, KHARE TO\I/N, NAGPUR, demarcated by its to the North-P. NO. 903A, to the South -P. NO. 21to the East- CONSERVANCY LANE to the West- 9.00 M WIDE ROAD of Division- KHARE TOWN, village - DHARAMPETH,TaIUka/Tehsrl - NAGPUR District - NAGPURPIN- 440010 ,admeasuring 1023.31 Sq.Mtrs. area being developed by [Promoter's Name- M/S. M.KULKARNI BUILDERS and INFRASTRUCTURE PW.LTD.] Sir, I WRUSHALI PUNWATKAR have undertaken assignment of certifying Estimated Cost f,:r the Subject Real Estate Project proposed to be registered under Maha-RERA- P50500051101, being ONE Building(s)/ ONE Wing(s) of the ONE Phase situated on the plot bearing 9C3B, KH. N0. 45 CTS. NO. 124, SHEET NO. (25X9-11, HOUSE NO. 350/A/8, MZ-LENDRA, KHARE TOWI'{ and P. NO. 393/A, KH. NO. 172, CTS NO ,12312, SHEET NO. 25119, NMC HOUSE NO. 349, MZ. LENDRA, KIARE TOWN, NAGPUR of Division - KHARE TOWN village DHARAMPETH, Taluka/Tehsil NAGPUR Dis:rict NAGPUR. PIN-440010 admeasuring- 1023.31 sq. mtrs. Area being developed by [Pro,rrctei's Name- M/S.M.KULKARNI BUILDERS and INFRASTRUCTURE PVT.LTD. 1. Following technical professionals are appointed by Owner / Promoter :- (i) M/siShri/Smt-ABHIJIT AMBADAS ASOLKAR as L.S. / Architect i . (ii) M/s /Shril Smt- PRASHANT Y GHUSHE as Structural Consultant; i (iii) M/s /Shri/ Smt as MEP Consultant; (iv) M/s /Shri/ Smt .as Quantity Surveyor. &,*4 WRIJ S H,A I-I PIJ NWATKA P. BE (Civil), lill'ech (Structural [ntg.i (2) 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by - MYSELF-quantitySurveyor*appointedbyDeveloper/Engineer,andthe assumption of the cost of material, labour and other inputs made by developer, and the site inspection :I:ffJtJlr", Estimated cost of comptetion of the buiuins(s) of the projeci under reference as Rs 83307133.00 (Total of Table A and B). The estimated Total"ror".rio Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the NMC, NAGPUR, being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost lncurred till date is calculated at Rs. 58073495.00 (Total of Table A and B). The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from NMC, NAGPUR, (planning Authority) is estimated at Rs-25233638.00 ( Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below : P Building M/ing bearing Number-ONE or called - MK-ALTAMOUNT APARTMENTS (to be preparcd separately for each Building lWing of the Real Estate Project) Sr. Particulars Arnounts No. 1 Total Estimated cost of the building/wing as on 25.Q5.2023 date of Rs Registration is 83307133.00. 2 Co-st incurred as on15.4.2025 Rs. (based on the Estimated cost ) 5807349s.00 3 Work done in Percentage 69 710.h (as Percentage of the estimated cost ) 4 Balance Cost to be lncurred Rs.25233638.00 (Based on Estimated Cost) 5 Cost,lncurred on Additional /Extra ltems Rs. 00.00 as on _not included in the Estimated Cost (Annexure A) t, (3) TABLE B a' "rr a.: - -r, {rqrtElBw6!*ffit ffi.FPr" . (to be prepared for the entire registered phase of the Real Estate Project) Sr. Particularc Amounts No 1 Total Estimated cost of the lnternal and External Development Works including Rs. amenities and Facilities in the layout as or date of Registraticn is 83307'133.00 /- 2 Cost incurred as on Rs. (based on the Estimated cost ) 58073495.00/- 3 Work done in Percentage - 69.71o/o (as Percentaqe of the estimated cost ) 4 Balance Cost to be lncurred Rs. (Based on Estimated Cost) 2s233638.00/- 5 Cost lncurred on Additional/Extra ltems as on not included in Rs. 00.00/- the Estimated Cost (Annexure A) Yours Faithfully Signature of Engineer $.,$#,# * Note 1. The scope of work is to complete entire Real Estat6 Project as per drawings approved from iime to time so as to obtain Occupation Certificate /Completion Certificate. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engir;eer. ln car;e of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) and in case quantity are being calculated by office of Engineer, the name of the per,son in the office of Engineer, who is responsible for the quantity calculated should be menticried at ther place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery requtred to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. 5. All components of work with specifications are indicative and not exhdttstive. ! Annexure A List of Extra / Additional ltems executed with Cost (which were not part of the original Estimate of Total Cost) -N^*'rvArKAB, il ilsh ($tructuralEn(is') #fi;il,