Annexure-B FORM-2 (See Regulation 3) ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account) Date: 10/04/2023 To, The Metrocity Projects, Ground Floor, 11A Khare Town, Dharampeth, Nagpur - 440010 Subject:Certificate of Cost Incurred for Development of of Metrocity VI having MahaRERA Registration Number P50500050247 being Developed by Metrocity Projects . Sir, 1 Ashwin Meshram has undertaken assignment of Certifying Estimated Cost for Metrocity VI having MahaRERA Registration Number P50500050247 being Developed by Metrocity Projects. 2 We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / Consultants. The Schedule of Items & Quantity required for the entire work as calculated by Mr. Ashwin Meshram Quantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site Inspection carried out by us to ascertain I confirm the above analysis given to us. 3 We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at f 42,625,000.00 {Total of Table A & B) at the time of Registration. The estimated Total Cost of roJec ,s w, re erence to the Civil, MEP & Allied Works completion of the apartments & proportionate completion of internal & external works, as per the specifications mentioned Agreement of Sale & for the Building{s) I Wing{s) / Layout / Plotted Development from the NMRDA being the Planning for purpose of obtaining Occupation Certificate I Completion Certificate for in the Authority under whose jurisdiction the aforesaid Project is being implemented. I 4 The Estimated Cost incurred till date is calculates to f 17,050,000.00 (Total of Table A & B). l The Amount of Estimated Cost Incurred is calculated on the basis of input materials / services used & unit cost of these items. 5 The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimated at .I.·f_ _ _ ___::.25:.:..,5;;.:.7~5,~00:.:.0.:.:.00:..JI (Tota I of Table A & B). 6 1Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works as I p~r the ~pecifi~atlons mentioned in Agreement of Sale, of the aforesaid Project as completed on the dat~ of this certificate 1s as given in Table A & B below: I TABLE-A Building f Wmg f Layout / Plotted Development bearing Number _ _ _ _ or called I _ _ _ _ _ _ (to be prepared separately of each Building / Wing / Layout / Plotted Development of the Real Estate Project) Amount !in Rs.\ S. No. Particulars Total Estimated Cost of Building / Wing / Layout I 1 Plotted Development as on date of Registration is Cost incurred as on date of Certificate 2 Work Done in Percentage (as Percentage of Estimated 3 Cost\ Balance Cost to be incurred ** ((based on Estimated NA 4 Cost\ Cost incurred on Additional / Extra Items not included in 5 the Estimated Cost (Table-C) Note : Not applicable in case of Projects in Plotted Development and Sale of Land TABLE-B Internal & External Development Works in respect of Registered Phase Amount (in Rs.) S. No. Particulars Total Estimated Cost of Internal & External Development 42,625,000.00 Works including amenities & facilities in the Layout as f 1 on date f 17,050,000.00 Cost incurred as on date of Certificate 2 40% Work Done in Percentaoe f 25,575,000.00 3 Balance Cost to be incurred 4 Cost incurred on Additional / Extra Items not included in NIL 5 the Estimated Cost (T able-C) Yours faithfully, Mr. Ashwin Meshram . [Not fess than Bachelor's Degree Holder or equivalent as per Section 2(u) of the Act] . Local Authority License Number (if a licable) Signature of Promoter Name: Mrs. Vrushali P Bongirwar Date: 10/04/2023 TABLE-C List of Elttta / Additional / Deleted ltems considered in the Cost hith Were not arts of the ori inal Estimate of 'l'otal Cost 11, llo. u,1 ol htra I MdlUonal I Deleted Items Amount \In RI.) 2 N\l