PAWAN RAV'PRASAll GUPTA CONSULTING CfVfL ENGfNEER PLANNERS, ElIffDERS AND DEVELOPERS LfCENCE. NO. N.f.1. -1161, N.H.C.--;gO,N.H.R.D.A- -;1 OFF. : - SHOP NO.1 15 SECOND FLOOR SHRI SHYA:vlTOWER SADAR NAGPUR - 44000 I. lvI- 9923432949 DATE :- 30-06-2023 ARCHITECT'S CERTIFICATE To MIs. Mahalaxmi Aedificators Private Limited N-103, 104, Laxmivihar Apartment, Wardha Road, Somalwada, Nagpur-44002S. Subject: Certificate of Percentage of Completion of Development Work of the Mis. Mahalaxmi Aedificators Private Limited [Mahalaxmi Nagar- 27] (KH.NO. 12/1 & 13/1 Mouza - Mohgaon) having [Maha RERA Registration Number PSOSOOOS0316] being developed by [Mis. Mahalaxmi Aedificators Private Limited] Sir, II We Pawan R. Gupta have undertaken assignment as Architect lLicensed Surveyor of certifying Percentage of Completion of Development Work of MIs. Mahalaxmi Aedificators Private Limited having [Maha RERA Registration Number PSOSOOOS0316] being developed by [MIs. Mahalaxmi Aedificators Private Limited] Based on Site Inspection, with respect to the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for the entire Real Estate Project as each as registered vide number P50500050316 under Maha RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. ~ Pawan 2\flviprasad Cjupta B.E. (CIVIL) PLANNERS, BUILDERS AND DEVELOPERS Lie. No.N.LT.1969,N.M.R.DA 39, N.M.C.380 Off.: Shop No.11S Second Floor, Sliriram Shyam Tower, Sadar Nagpur-44.0001. E·rraii ID pawan_r_gupta @yahoo.co.in M'JB No 99234~2949. Table A Building /Wing Number __ (to be prepared separately for each Building /Wing of the Project) Sr. Tasks IActivity Percentage of No work done 1 Excavation Not Applicable 2 number of Basement(s) and Plinth Not Applicable 3 number of Podiums Not Applicable 4 Stilt Floor Not Applicable 5 Plinth Not Applicable 6 number of Slabs of Super Structure Not Applicable 7 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors Not Applicable and Windows to each of the FlaUPremises 8 Sanitary Fittings within the FlaUPremises, Electrical Fittings within the Not Applicable FlaUPremises - 9 Staircases, Lifts Wells and Lobbies at each Floor level connecting Not Applicable Staircases and Lifts, Overhead and Underground Water Tanks 10 The external plumbing and external plaster, elevation, completion of Not Applicable terraces with waterproofing of the Building/wing, 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as Not Applicable per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate NOTE. Table -A is not applicable to this project as it is a project of plotted development (layout of plots) and not construction of building. ~ Pawan _o N.19923432949