Er. Dhawal Harshe B.E. & D.c.e. (civit) s' grsggs5005 ffi 8 dhawal. harshe@Email.com DIVINE PROJECT5 Arch itects. En Ei neers, Co ntr actor J. FORM 1 [see Regulation 3] DPltzt3 ARCHITECT'S CERTIFICATE Date: O2/OI/2025 To, Prasanna Developers & Prasanna Planners Plot No 6, Ramkrishna Nagar, Wardha Road, Nagpur-4400 15(MH) Subject: Certilicate of Percentage of Completion of Construction Work of MORESHUIAR PARK 5 having MahaRERA Registration no. P5O5OOOSO242 situated on The r,and Bearing Kh lto grlt, Mouza - Jamtha, Tah. - Nagpur(Gf' Dist.- Nagpur being developed by Prasanna Developers & Prasanna Planners. Sir, l/ We Architect Dhawal Harshe have undertaken assignment as Architect /Licensed Surveyor of certiffing Percentage of Completion of Construction Work of MORESHIIAR PARI( 5, having MahaRERA Registration no. P5O5OOO5O242 being developed by Prasanra Developers & Prasanaa planners. Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project, I certiff that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. L *9.'l?i;l[";il,l;",1T,i";i:;trfl1]'ffi;;if tr^!i,i,1{;. Table A MORESHWAR PARK 5 Sr. Tasks /Activity Percentage No of work done 1 Excavation NA 2 Basements (if any) NA 3 Podiums (if any) NA 4 Plinth NA 5 Stilt Floor NA 6 Slabs of Super Structure NA 7 Internal walls, Internal Plaster, Floorings, Doors and NA Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises NA 9 Staircases, Lifts Wells and lobbies at each Floor level, NA Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, NA completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and NA Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. TABLE-B common Areas (Internal & E:rternal Development worksf in Respect of the entire Registered Phase / Project Number S.No. Common areas and Propos Percentage Details Facilities, Amenities ed of (Yes/N Actual Work of done (As on date of the certilicatel 1 Internal Roads & Footpaths Yes IOOo/o 2. Water Supply Yes lOOo/o 3. Sewerage (chamber, lines, Yes lOOo/o Septic Tank, STP) As Per Layout 4. Storm Water Drains Yes TOOo/o Plan 5. Landscaping & Tree Planting Yes lOOo/o 6. Street Lighting Yes IOOYo 7. Community Buildings No 0 NA B. Treatment and disposal of No o NA sewage and sullage water 9. Solid Waste management & No 0 NA Disposal 10. Water conservation/ Rain No 0 NA water harvesting 11. Energr management No 0 NA 12. Fire protection and fire safety No 0 NA Requirement 13. Elec tric al metef;?O