Er. Dhawal Harshe B.E. & D.C.E. (Civil) ~ 915885500S ~ dhawal.harshe@ 9mail.com FOM~J.__ _ _ _ _ _ _ _ _ _ _ _ _ _) [eee Regulation 3] DIVINE PROJECTS ARCHITECT'S CERTIFICATE Architects. Engineers. Contractors. 0Plfr9 Date: 01/04/2024 FOR QUARTER ENDIKG 31BT MARCH 2024 (QTR 4TB 2023-2024) To, Prasanna Developers & Prasanna Planners Plot No 6, Ramkrishna Nagar, Wardha Road, Nagpur-440015(M H) Subject: Certificate of Percentage of Completion of Construction Work of MORESHWAR PARK 5 having MahaRERA Registration no. P50500050242 being developed by Prauuua Developen a. Praaauua Plannen. Sir, I/ We Architect Dhaval Harahe have undertaken assignment as Architect /Licensed Surveyor of _certifying Percentage of Completion of Construction Work of MORESHWAR PARK S, having Mah_a RERA Registration no. PS0SOOOS0242 being developed by Prasanna Developers & Prasanna Plannen. Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in ____.Jf--::--. Table B. - ,:Flat No. 20~ Plot No. J9, Ciii ~ sfM of Chfntamani bear Table A MORESHW AR PARK 5 Sr. Tasks / Activity Percentag e No of work done 1 Excavation NA 2 Basements (if any) NA 3 Podiums (if any) NA 4 Plinth NA 5 Stilt Floor NA 6 Slabs of Super Structure NA 7 Internal walls, Internal Plaster, Floorings, Doors and NA Windows within Flat/Premi ses 8 Sanitary Fittings within the Flat/Premi ses NA 9 Staircases, Lifts Wells and Lobbies at each Floor level, NA Overhead and Undergrou nd Water Tanks 10 External plumbing and external plaster, elevation, NA completion of terraces with waterproof ing of the Building/W ing 11 Installation of lifts, water pumps, Fire Fighting Fittings and NA Equipmen t as per CFO NOC, Electrical fittings, mechanica l equipment , Complianc e to conditions of environme nt / CRZ NOC, Finishing to entrance lobby/ s, plinth protection, paving of areas appurtena nt to Building/W ing, Compound Wall and all other requiremen ts as may be required to complete project as per specificatio ns in agreement of Sale. Any Other Activities. _--,..'"".,. ..,---~ .~ :""0 \,l! :~ '·~~~ 2 TABLE-B Common Areas (Internal • External Developmen t Works) in Respect of the entire Registered Phase / Project Number S.No. Common areas and Propoa Percentage Details Facilities, Amenities ed of (Yes/N Actual Work o) done (As OD date ofthe certificate) 1 Internal Roads & Footpaths Yes 100% As Per Layout Plan 2. Water Supply Yes 100% As Per Layout Plan 3. Sewerage (chamber, lines, Yes 100% As Per Layout Plan ' Septic Tank , STP) 4. Storm Water Drains Yes 100% As Per Layout Plan 5. Landscaping & Tree Planting Yes 100% As Per Layout Plan 6. Street Lighting Yes 100% As Per Layout Plan 7. Community Buildings No 0 NA 8. Treatment and disposal of No 0 NA sewage and sullage water 9. Solid Waste management & No 0 NA Disposal 10. Water conservation / Rain No 0 NA water harvesting 11. Energy management No 0 NA 12. Fire protection and fire safety No 0 NA Requirement 13. Electrical meter room, sub- Yes 100% As Per Layout Plan station, receiving station Yo urs Fa ith ful ly AL 8. HARSHE Na me : - SH RI. DH AW Lic ens e En gin eer / .1!.reluteet (N. M. R.D .A. Lic ens e No - 61 ) (N.I.T. Lic ens e No - 30 00 ) Sig nat ure Of Pro mo ter Name - Nik hil Pra kas h Ch apl e Au tho riz ed Sig nat ory Pra san na De vel ope rs & Pra san na Pla nne rs Dat e:- 01/ 04/ 202 4 Agr eed and Acc ept ed by: 4