Er. Dhawal Harshe B.E. & D.c.e. (Civil) ~ 915885500S ~ dhawat.harshe@ 9mait.com j i,'QRM J [see Regulation 3) DIVINE PROJECTS ARCHITECT'S CERTIFICATE Archit ects. Engineers. Contract ors. OPl1~2. Date: 04/0 1/2024 FOR QUARTER ENDING 31BT DECEMBER 2023 (QTR 3RD 2023-2024) To, Prasanna Developers & Prasanna Planners Plot No 6, Ramkrishna Nagar, Wardha Road, Nagpur-440015(MH) Subject: Certificate of Percentage of Completion of Construction Work of MORESHWAR PARK 5 having MahaRERA Registration no. P50500050242 being developed by Prasanna Developers & Prasanna Planners. Sir, I/ We Architect Dhaval Harshe have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of MORESHWAR PARK 5, having MahaRERA Registration no. P50500050242 being developed by Prasanna Developers & Prasanna Planners. Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detaile ._..z:-- ~ Table B. J.Fldt. No. 201, Plot No. 39, Gayitii NI 14dt side of Chlntamanl bar, MClnewade1.;__,;,;~ ' ' ' ' Table A MORESHWAR PARK 5 Sr. Taaka / Activity Percentage Bo of work done 1 Excavation BA 2 Basements (if any) WA 3 Podiums (if any) WA 4 Plinth WA 5 Stilt Floor WA 6 Slabs of Super Structure WA 7 Internal walls, Internal Plaster, Floorings, Doors and BA Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises BA 9 Staircases, Lifts Wells and Lobbies at each Floor level, BA Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, BA completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and BA Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CR.Z NOC, Finishing to entrance lobby/ s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. - ·L ~"'~ 7(")' / . / ,1~? / 4'((,f, ~ !?J n, .._. \ ~~,:.,;;;, ') TABLE-B Comm on Areas (Internal & External Develo pment Worb) in Respec t of the entire Reglatered Phase / Project Number Propo■ Percen tage Details S.No. Common area• and Facillt fes, Amenftfes ed ol (Yes/11 Actual Work o) done (As on date ofthe certific ate) Yes 95% As Per Layout Plan 1 Interna l Roads & Footpa ths Yes 88% As Per Layout Plan 2. Water Supply Yes 90% As Per Layout Plan 3. Sewera ge (chamb er, lines, Septic Tank , STP) Storm Water Drains Yes 85% As Per Layout Plan 4. 5. Landsc aping & Tree Plantin g Yes 72% As Per Layout Plan 6. Street Lighting Yes 82% As Per Layout Plan 7. Commu nity Buildin gs No 0 NA 8. Treatm ent and disposa l of No 0 NA sewage and sullage water 9. Solid Waste manage ment & No 0 NA Dispos al 10. Water conserv ation/ Rain No 0 NA water harvest ing 11. Energy manage ment No 0 NA 12. Fire protect ion and fire No 0 NA safety Require ment 13. Electric al meter room, sub- Yes 100% As Per Layout Plan station, receiving station r I Youn Faithf ully HE Licen se Engin eer/ Al'ell lteet !fame : - SHRJ. DHAWAL 8. BARS (JJ.M.R.D.A. Licen se lfo- 61) (N .I. T. Licen se Ifo- 3000) Signature Of Promo ter Name - Nikhl l Prakash Chapl e Autho rised Signat ory Pruan na Devel opers & Pruan na Plann ers Date:- 04/01 /2024 Agreed and Accepted by:- 4