Er. Dhawa( Harshe B.E. & D.C.E. (Civil) 915885500S dhawal.harshe@9mail.com F&RM 1 J [see Regulation 3] DIVINE PROJECTS ARCHITECT'S CERTIFICATE Architects. Engineers. Contractors. D~l1g/ Date: 03/07/2023 FOR QUARTER ENDING 30T8 JUNE 2023 (QTR I BT 2023-2024) To, Prasanna Developers & Prasanna Planners Plot No 6, Ramkrishna Nagar, Wardha Road, Nagpur-4400 lS(MH) Subject: Certificate of Percentage of Completion of Construction Work of MORESHWAR PARK 5 having MahaRERA Registration no. P50500050242 being developed by Prasanna Developers & Pnl.sanna Planners. Sir, I/ We Architect Dhaval Harshe have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of MORESHWAR PARK 5, having MahaRERA Registration no. PS0SOOOS0242 being developed by Prasanna Developers & Prasanna Planners. Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed 1:;.;·n~-t--:- Table 8. .t. Fl4t. No. 201, Plot No. 39, Gcay B4ck side of Chintamcani bar, M4MWWl4""- • pa Table A MORESHWAR PARK 5 Sr. - Tub / Activity Percentage No or work done 1 Excavation NA 2 Basements (if any) NA 3 Podiums (if any) IIA 4 Plinth IIA 5 Stilt Floor !IA 6 Slabs of Super Structure !IA 7 Internal walls, Internal Plaster, Floorings, Doors and !IA Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises !IA 9 Staircases, Lifts Wells and Lobbies at each Floor level, NA Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, NA completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and NA Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/ s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. 2 I TABLE-B Common Areas (Internal 81 External Development Work•) in Respect ofthe entire Regiatered Phase / Project Number S.No. Common areas and FacWtles, Propose Percentage or Detaila Amenitiea d Actual Work (Yes/No done ) (As on date or the certificate) 1 Internal Roads & Footpaths Yes 75% As Per Layout Plan 2. Water Supply Yes 45% As Per Layout Plan 3. Sewerage(chamber,lines,Septic Yes 45% As Per Layout Tank, STP) Plan 4. Storm Water Drains Yes 38% As Per Layout Plan 5. Landscaping & Tree Planting Yes 5% As Per Layout Plan 6. Street Lighting Yes 48% As Per La.yout Plan 7. Community Buildings No 0 NA 8. Treatment and disposal of sewage No 0 NA and sullage water 9. Solid Waste management & No 0 NA Disposal 10. Water conservation/ Rain water No 0 NA harvesting 11. Energy management No 0 NA 12. Fire protection and fire safety No 0 NA Requirement 13. Electrical meter room, sub- Yes 55% As Per Layout station, receiving station Plan - \ i? (1)1: . L 11o~r°"~~ '{ ;.-j ''"~.; .s. \ y '':JJ'Jt11. le ,, } \....... ' •5;,~5s•: \.;:h Jii :#' Youn Falthtlllly JIAR81IE Llceme Eqln eer/ Areltlteet 1'ame: - 8RRJ. DRAWAL 8. (R.11.R.D.A. Lleeme 1'0- 61) (R .I.T. Llceme 1'o- 3000) Signature or Promoter P· . ue~ s Pres.arma Planner, Name • 1'1khll Prakash Chaple Authorized Stpat ory Pn.N11na Devel open • Prop(ie{or Par1ne· Pruaa na Plann en Date:- 03/07 /2023 Agreed and Accepted by: 4