Er. Dhawaf Harshe B.E. & D.C.E. (Civil) 915885500S dhawal.harshe@9mail.co m .......1.,_____________;.;..__ _ _ _ _ rokll =_=_=_=-_J [see Regulation 3] DIVINE PROJECTS ARCHITECT'S CERTIFICATE Architects. Engineers. Contractors. DP\fio Date: 02/04/2023 FOR QUARTER El'fDING 31ST MARCH 2023 (QTR 4TB 2022-2023) To, Prasanna Developers & Prasanna Planners Plot No 6, Ramkrishna Nagar, Wardha Road, Nagpur-440015(MH) Subject: Certificate of Percentage of Completion of Construction Work of MORESHWAR PARK 5 having MahaRERA Registration no. P50500050242 being developed by Prasanna Developers • Prasanna Planners. Sir, I/ We Architect Dhaval Harahe have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of MORESHWAR PARK 5, having MahaRERA Registration no. P50500050242 being developed by Prasanna Developers • Prasanna Planners. Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. -....:; n~ ;s, ... 111'. .,,.. tc•"l 2.. -.IJlit. No. 201, Plot No. Jt, --=- ar:7 a.ack side of Chlntc1tft41111 IMr, Table A MORESHWAR PARK 5 Sr. Tub / Activity Percentage No of work done 1 Excavation NA 2 Basements (if any) NA 3 Podiums (if any) RA 4 Plinth RA s Stilt Floor NA 6 Slabs of Super Structure NA 7 Internal walls, Internal Plaster, Floorings, Doors and NA Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises RA 9 Staircases, Lifts Wells and Lobbies at each Floor level, NA Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, RA completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and NA Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/ s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. TABLE-B Common Areas (Internal & External Development Works) in Respect of the entire Registered Phase/ Project :Number S.No. Common areas and Propos Percentage Details Facilities, Amenities ed of (Yes/R Actual Work o) done (As on date ofthe certificate) 1 Internal Roads & Footpaths Yes 55% As Per Layout Plan 2. Water Supply Yes 10% As Per Layout Plan 3. Sewerage (chamber, lines, Yes 32% As Per Layout Plan Septic Tank , STP) 4. Storm Water Drains Yes 12% As Per Layout Plan 5. Landscaping & Tree Planting Yes 0% As Per Layout Plan 6. Street Lighting Yes 25% As Per Layout Plan 7. Community Buildings No 0 NA 8. Treatment and disposal of No 0 NA sewage and sullage water 9. Solid Waste management & No 0 NA Disposal 10. Water consetvation/ Rain No 0 NA water hatvesting 11. Energy management No 0 NA 12. Fire protection and fire safety No 0 NA Requirement 13. Electrical meter room, sub- Yes 12% As Per Layout Plan station, receiving station {-' •• c:?as • "'(\e Faithf ully at • E License Engine er/ ANMte et !fame: - SHRI. DBAW AL S. HARSH (N.M.R .D.A. License No- 61) (N.I.T. License No- 3000) Signatu re Of Promo ter Name - Nikhil Prakas h Chaple velop Prasa Authorized Signato ry Prasanna Develo pers & Prasanna Planners Date:- 02/04/ 2023 Agreed and Accepted by: 4