ANNEXURE A FORM-2A |See Regulation 3A ASSURANCE ENGINEER'S CERTIFICATE FOR QUALITY (Site Supervisor's Certificate) Date 1209-2025 To, SHUBH CONSTRUCTION, 78, Shivaji Nagar, Chaitanyapith Apartment, Nagpur - 440010 Quality Assurance Certificate for the yer ending 2025) (Certificate No. workmanship for the of materials used and qualityof constructiorn and Subject :Certificate for quality P505000502 17 being developed by MahaRERA Registration Number work of ACHRAJ KUTUMB having Shubh Construction. Sir, project. undertaken the assignment of supervision of this real estate I/We, Milind Sharma have Our Responsibility. development permission and as per the approved plan, to the wcrk in accordance with the an authorized To carry out work, to carry out material testing in-situ or in submit certificate of supervision of and workmanship as applicable standards, toensure quality of work laboratory as per prevailing and relevant code of practice. specifications, and as per NBC and/ or other per prescribed details of thequality are as follows: The Stability and Testing 1. Structural Design, Yes No Remarks Parameters Sr. No. Whether soilinvestigations of the site has been conducted and soil parameters have been 1 before the structural design design/ drawings? accounted for in the structural Name: been appointed for the 2 Whether Structural Engineer has NO License No: project? Mobile: E-mail:. 3 Whether the inspection registers, site order book and quality control test registers are maintained at the siteye properly and endorsed by the Engineer-in-Charge? 4. Whether testing facilities to check quality of material is available at site? No 5 Whether the statuary provisions for disaster resistance/ earthquake resistant design have been incorporated, NO |specially in case of multi-storeyed construction? 6. Has suitablecognizance been taken on demarcated flood lines and appropriate precautionstaken for protectingthe 1 site from flooding considering local flooding issues? A 2. Input Materials Sr. Parameters Yes No Remarks No. 1 Whether the following building materials confirm to relevant IS/BS/NBC Code, or as per Industry Standards? yes If yes, provide details: (a) Cement, concrete and coarse aggregate yes Ultrtehenwat (b) Steel and its alloys yes (c) Electrical wire, fittings and accessories (d) Plumbing and sanitary fittings yes only plumbing 2 Whether regular tests of materials and construction (reoteeh lab products are being done from accredited labs also? If yes, yes details of such labs . NgPus 3 Whether manufacturer test certificate for cement, steel, pipes etc. have been obtained and whether supply records yes are being maintained? 4 Whether suitable water is being used for construction? yes (i) What is the source of water? Well wate (ii) Has water been tested and approved by Engineer-in Charge before construction? yes (i1i)Has water been tested subsequently as per tequirement? yes 3.Quality of Workmanship Parameters Yes No Remarks Sr. No. 1 Whether works of all the electrical wiring/ connections/ Registeaat lift installation/ other eleCtrical installations have been eleetilal carried out under authorized /registered electrical whether records of the same has been es Contsactoy engineer and maintained? jappointeol. 2. Whether all related works of plumbing & sanitary Reg steed Cmsactor including installation of water supply systems, 4es drainage systems, sewage systems, sinks, toilets etc. appointad have been carried out under authorized /registered plumbers / sanitary contractors and whether records of the same has been maintained? 3 Whether all the work is being carried out under supervision of experienced and skilled professional? Further, whether the workmanship and quality is yes satisfactory and up to the mark and the work is within the acceptable and permissible limits of dèviations as per relevant Code of Practice? undertaken to prevent 4. Whether remedial measures are details dampness and leakages ? If yes, provide 5. Whether safety precautions are undertaken during 4es construction activities for all type of workers ? 4. Miscellaneous Sr. Parameters Yes No Remarks No. 1 Whether third party quality inspection is being cartied out on site during/after completion of the works? If yes, provide details. 2 Whether anti-termite treatment has been undertaken for the soil? tor auti 3 Whether fire-fighting arrangements has been undertaken tehnite under supervision of fire consultant? Whether proper signages have been installed on site/ 5 completed building as per requirement? Whether precautions are undertaken to avoid air pollution yes 6 during construction? Please specify. Whether records of all test reports results have been |Yes properly kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be Yes handed over to the association of allottees? 7 Whether all relevant records including sanctioned building plans, utility drawings, various test reports / results have been properly kept in the prescribed formats to ibe handed Yes over to the association of allottees? 8 Any innovative/ cost effective/ green technology has been STP Plat used for improving quality/energy efficiency? Please specify Egtabi'ed Ree witel to Yours Faithfully, Signature of Engineer (Site Supervisor) Name: Mr. Milind Sharma Qualification (Diploma in Construction Technology) License No. (if any): Phone No: 9370469931 Place: Nagpur Agreedand accepted by Signature of Promoter Name: Abhishek Javery Date:12-09-2025