NikhilS. Bende Consulting Civil Engincer 20, First Floor, Shree Ganesh Chamber, Mehadia Square, Dhantoli, Nagpur. NIT LS.-1492 STATEL.S, - STATE/RI2024/APL/10000 Form 2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for with drawal of Money from Designated Account - Project Wise) To, Date:15-07-2025 SHUBH CONSTRUCTION, 78, Shivaji Nagar, Chaitanyapith Apartment, First Floor, Nagpur - 10 Subject:Certificate Of Cost Incurred For Development Of Achraj Kutumb having MahaRERA Registration Number P50500050217 being developed by SHUBH CONSTRUCTION For the quarter ending June 2025. Sir, 1. INIKHIL BENDE have undertaken assignment of certifying Estimated Cost for Project Name having MahaRERA Registration Number P50500050217 Being developed by SHUBH CONSTRUCTION. 2. I have estimated the cost of the Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal &external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer / Consultants and the Schedule of items and quantity for the entire work as calculated by NIKHIL SUNIL WANJARI BENDE Quantity Surveyor* appointed by Developer and the assumption of the cost of the cost material, labor and other inputs made by developer, and the site inspection carried out by us to ascertain/ confirm the above analysis given to us. 3. Iestimate Total Estimated Cost of completion of the aforesaid project under reference at Rs.3,71,00,000 at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required for completion of apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement to sale and for the purpose of obtaining occupation certificate / completion certificate for the Building(s) /Wing(s) /Layout / Plotted Development from the Nagpur Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs.2,40.15,539. The amount of Estimated COst Incurred is calculated on the basis of input materials / services used & unit cost of these items. 5. The Balance cost of Completion of the Civil, MEP and Allied works for completion of the apartment and proportionate completion of internal & external works, as per specifications mentioned in agreement to sale of the Project is estimated at Rs.1,30,84,461. 6. I Certify that cost for the Civil/MEP / Allied Work for the apartment and proportionate Completion of internal &external works, as per specifications mentioned in agreement to sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below. Table A Building /Wing / Layout/ Plotted Development bearing Number or called Achraj Kutumb (Tobe prepared separately for each building/ wing / Layout/ Plotted Development of the Real Estate Project) Sr.No. Particulars Amount (In Rs.) 1 Total Estimated Cost of Building / Rs. 3,71,00,000 Wing / Layout / Plotted Development As On Date Of Registration is 2 Cost Incurred As On 30-06-2025 Rs. 2,40,15,539 3. Work Done In Percentage 64.731 % (As Percentage 0f Estimated Cost) 4 Balance Cost To Be Incurred (Based Rs. 1,30,84,461 on Estimated Cost)** 5 Cost Incurred In Additional/Extra NIL Item not included in the Estimated Cost (Table - C) Table B Registered Phase Works in Respect of the Internal & External Development Amounts Sr. No. Particulars Internal and 1. Total Estimated Cost of the including external Development Works in the layout as on amenities and facilities date of Registration is 2 Cost Incurred As On 30-06-2025 3. Work Done In Percentage Cost) (As Percentage Of Estimated 4. Balance Cost To Be Incurred (Based on Estimated Cost) Item 5 Cost Incurred In Additional/ Extra not included in the Estimated Cost (Table - C) Yours Faithfully, NIKHIL S. BENDE CONSULTING ENGINEER B.E. M-Tech (Structures) NIT LS. No.: 1492, NMC LS. No.: 133 20, First Floor, Shree Ganesh Chambers, Mehadia Square, Dhantoli, NAGPUR-12 Signature & Name of Engineer LS no. STATE/R/2024/APL/10000 Agred and Accepted by: SHUBH CONSTRUCTION PARTNER Signaturepf Promoter Name: M/s. Shubh Construction, Through its partner Shri. Abhishek Salilkumar Javery Date -15/07/2025 Note: 1. The scope of work is to complete Registered Real Estate Project as per drawis approved from time to time and as per specifications mentioned in agreement of Seie by an uantity survey can be done by office of Engineer or can be done Inaependent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked () and in case quantity person in the office of ale beng calculated by office of Engineer, the name of the mentioned at the Engineer, who is responsible for the quantity calculated should be place marked (*) Total 3. (*) Balance Cost to be incurred (4) may vary from Difference between estimated cost (1) and Actual Cost incurred (2) due to deviation in quantity required /escalation of cost etc. As this estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred /to be incurred. exhaustive. 4. Allthe components of work with specifications are indicative and not Any deviation in 5. Please specify if there are any deviations / qualifications. Example: input material used from specifications in agreement of sale. Table C List of Extra/Additional / Deleted Items considered in Cost (Which were not part of the original estimate of Total Cost) Sr. No. List of Extra/ Amount (In Rs.) Additional/ Deleted Items NIL