Nikhil S. Bende Consulting Civil Engineer 20, First Floor, Shree Ganesh Chamber, Mehadia Square, Dhantoli, Nagpur. NIT LS.-1492 STATE L.S. STATE/R/2024/APL/10000 FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 15-07-2025 To, SHUBH CONSTRUCTION, 78,Shivaji Nagar, Chaitanyapith Apartment, First Floor, Nagpur - 10 Subject: Certificate of Percentage of Completion of Construction Work of ACHRAJ KUTUMB having MahaRERA Registration Number P505000502 17 being developed by SHUBH CONSTRUCTION For the quarter ending June 2025. Sir, I Nikhil S. Bende have undertalken assignment as Licensed Surveyor of certifying Percentage of Completion of Construction Work of ACHRAJ KUTUMB having MahaRERA Registration Number P50500050217 being developed by SHUBH CONSTRUCTION. Based on Site Inspection, with respect to Layout / each of the Building/VWing of the aforesaid Real Estate Project, I certify that as on date of this certificate the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed inTable B. TABLE - A Layout / Building / Layout / Building/ Wing Number (to be prepared separately for each Wing of the Project) Percentage of Actual Sr Task / Activity Work Done (As on No. (2) date of the (1) Certificate) (3) 1. Excavation 2. Basements (if any) 0 3. Podiums (if any) 4. Plinth 5. Stilt Floor 0 6. Slabs of Super Structure Windows ) 7. Internal walls, Internal Plaster, Floorings, Doors and within Flats/Premises Sanitary Fittings within the Flat/Premises level, Overhead and 9 Staircases, Lifts Wells and Lobbies at each Floor Underground Water TankS completion of 10. External plumbing and external plaster,elevation, terraces with waterproofing of the Building/Wing. 11. Installation of lifts, water pumps, Fire Fighting Fittings And mechanical Equipment as per CFO NOC, Electrical fittings, environment/CRZ NOC, equipment, Compliance to conditions of Finishingto entrance lobby/s, plinth protection, paving of areas appurtenant to Building/ Wing, Compound Wall and all other requirements as maybe required to complete project as per specifications in agreement of Sale. Any other activities. Table B Common Areas (Internal and External Development Works) in respect to the Registered Phase / Project Number Sr.No Common areas Percentage of Details Proposed (1) and Facilities. (Yes/No) Work done (5) (2) (3) (As on date of the Certificate) (4) 1. InternalRoads& YES 85% C.C. ROAD Footpaths 2. Water Supply YES 100% 3. Sewerage (chamber, lines, Septic YES 90% COVER Tank, STP) BALANCE Storm Water Drains YES 90% COVER BALANCE 4. 5. Landscaping &Tree Planting YES 75% 6. Street Lighting YES 80% 7. Community Buildings NO 8. Treatment and disposal of YES 80% sewage and sullage water 9. Solid Waste management & NO 0 Disposal 10. Water conservation, Rain water YES 100% harvesting 11. Energy management NO 12. Fire protection NO 0 And fire safety requirements 13. Electrical meter room, sub YES station, receiving station 14. Open Space Compound wall & YES 90% development. Yours Faithfully, CONSUITNG ENGINEER B.E. lV-Tech (Structures) NIT LS. No.: 1492, NMC LS. No.: 133 20, First Floor, Shree Ganssh Chambers, A3hadia Square, Dhantoli, NAGPUR-12 Signature &Name (NIKHIL BENDE) of L.S (License No-STATE/R/2024/APL/10000) Agreed and Accepted by: sÀUBH CONSTRUQTION ePARTNER Signature of Promoter Name: M/s. Shubh Construction, Through its partner Shri. Abhishek Salilkumar Javery Date 15/07/2025