Annexure - B FORM-2 [See Regulation 3] ENGINEER'S CERTIFICATE Project and for Withdrawal of (To be submitted at the time of Registration of Ongoing Money from Designated Bank Account - Project wise) Date: 30.09.2024 To, M/s Harode Infrastructure Partner: Shri Arun Namdeorao Harode 32,33, NetajiNagar, Bhandara Road, Nagpur Harode Infrastructure "Goverdhan Nagari-lI" Subject: Certificate of Cost Incurred for Development of being Developed by M/s Harode lnfrastructure, having MahaRERA Registration Number 50500050093 Partner: Shri Arun Namdeorao Harode Netaji Nagar,, Bhandara Road, Nagpur Sir, Certifying Estimated Cost for Harode Infrastructure IN.K. Palsapure have undertaken assignment of P.H. no33, Mouza: Bidgaon, Ta: Kamptee, "Goverdhan Nagari-ll", Residential Layout for Kh No 100/1, 50500050093 being Developed by M/s Harode Distt: Nagpur having MahaRERA Registration Number Infrastructure Works required for completion of the Layout & 1 Ihave estimated the cost of Civil, MEP and Allied the Project as per the specifications proportionate completion of internal & external works of estimated cost calculations are based on the mentioned in the Agreement of Sale. Our under Reference by the Developers / Drawings/Plans made available to us for the Project for the entire work as calculated by N.K. Consultants. The Schedule of Items & Quantity required Developer/Engineer, the assumption of the cost of Palsapure Quantity Surveyor* appointed by the and the Site Inspection carried out by us material, labour & other inputs made by the Developer, toascertain /confirm the above analysis given to us. under completion of the aforesaid Project mentioned 2. We estimate Total Estimated Cost of the time of Registration. The estimated Total reference at Rs. 75,12,000/- (Total of Table A & B) at & & Allied Works completion of the apartments Cost of Project is with reference to the Civil, MEP per the specifications merntioned in the proportionate completion of internal & externalworks, as Occupation Certificate / Completion Certificate Agreement of Sale &for the purpose of obtaining N.M.R.D.A. being the for the Building(s) /Wing(s) /Layout I Plotted Development from the Planning Authority under whose jurisdiction the aforesaid Project is being implermented. 82.00,000/- (Total of Table A & B). The 3. The Estimated Cost incurred till date is calculates to Rs. materials / serviÇes used Amount of Estimated Cost Incurred is calculated on the basis of input unit cost of these items. Works for completion of Apartments & 4. The Balance Cost of completion of the Civil, MEP &Alied specifications mentioned in proportionate completion of internal & external works, as per NIL /- (Total of Table A &B). Agreement of Sale, of the aforesaid Project is estimated at Rs. I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & 5. Sale, of the aforesaid Project external works, as per the specifications mentioned in Agreement of Table A & B below: as completed on the date of this certificate is as given in TABLE- A Distt: Nagpur (to Residential Layout for Kh No 100/1, P.H. no 33, MOuza: Bidgaon, Ta: Kamptee, / Plotted Development be prepared separately of each Building/ Wing / Layout of the Real Estate Project) Sr. Particulars Amount (in Rs.) No. 1 Total Estimated Cost of Building / Wing / Layout / Plotted 75,12,000/ Development as on date of Registration is 2. Cost incurred as on date of Certificate 82,00,000/ 100% 3 Work Done in Percentage (as Percentage of Estimated Cost) 4. Balance Cost to be incurred ** (based on Estimated NIL Cost) 5. Cost incurred on Additional / Extra ltems not included in the Estimated Cost (Table-C) TABLE- B Internal & External Development Works in respect of Registered Phase Sr. Particulars Amount (in Rs.) No. 1 Total Estimated Cost of Internal &External Development Works including amenities &facilities in the Layout as on date of Registration is 2 Cost incurred as on date of Certificate 3 Work Done in Percentage (as Percentage of Estimated Cost) 4 Balance Cost to be incurred ** ((based on Estimated Cost) 5. Cost incurred on Additional /Extra Items not included in the Estimated Cost (Table-C) Yours faithfully, NARAYAN KAMALSAO PALSAPURE PALSAURE2. ASCOCIATES Consui he, Prci Consultant esigner Signature &Name (IN BLOCK LETTERS) with Stamp of Engineer Section 2(u) of the Act] as per [Not less than Bachelor's Degree Holder or equivalent Local Authority License Number (if applicable) STATE/RI2022/APL/O2027 Agreed &Accepted by: Signature of Promoter Name: ARUN NAMDEORAO HARODE Date: 30.09.2024 Note: drawings approved 1. The scope of work is to complete Registered Real Estate Project as per Sale. from time to time as per specifications mentioned in the Agreement of by an independent 2. (") Quantity Survey can be done by the office of Engineer or can be done In Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. has to be case of independent quantity surveyor being appointed by Developer, the name mentioned at the place marked (") & in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked ("). 3. (**) Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost (1)&actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred/tobe incurred. exhaustive 4. Allcomponents of work with specifications are indicative ¬ qualifications. Example: Any deviation in input 5. Please specify if there are any deviations / material used from specifications in Agreement of Sale. TABLE -C considered in the Cost List of Extra / Additional / Deleted Items Estimate of Total Cost) (Which were not parts of the original Amount (in Rs.) Sr. No. List of Extra / Additional / Deleted Items 1 2