Annexure-B FORM-2 (See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account - Project wise) Date: 31.03.2024 To, M/s Harode Infrastructure Partner: Shri Arun Namdeorao Harode 32,33, Netaji Nagar, Bhandara Road, Nagpur Subject:Certificate of Cost Incurred for Development of Harode Infrastructure "Goverdhan Nagari-11"' having MahaRERA Registration Number 50500050093 being Developed by M/s Harode Infrastructure, Partner: Shri Arun Namdeorao Harode Netaji Nagar, Bhandara Road, Nagpur Sir, I N.K. Palsapure have undertaken assignment of Certifying Estimated Cost for Harode Infrastructure •Goverdhan Nagao-ti-. Residential Layout for Kh No 100/1. P.H. no 33. Mouza: Bidgaon. Ta: Kamptee, Distt Nagpur having MahaRERA Registration Number 50500050093 being Developed by M/s Harode Infrastructure 1. I have estimated the cost of Civil, MEP and Allied Works required for completion of the Layout & proportionate completion of Internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / Consultants. The Schedule of Items & Quantity required for the entire work as calculated by N.K. Palsapure Quantity Surveyo,.. appoin~ed by the Developer/Engineer, the assumption of the cost of material, labour & other Inputs made by the Developer, and the Site Inspection carried out by us to ascertain / confirm the above analysis given to us. 2. We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 75.12.000/- (Total of Table A & B) at the time of Registration. The e~lmated Total Cost of Project Is with reference to the Civil, MEP & Allied Works completion of the apartments & proportionate completion of Internal & external works, as per the specifications mentioned In the Agreement of Sale & for the purpose of obtaining Occupation Certificate / Completion Certificate for the Bulldlng(s) / Wlng(s) / Layout / Plotted Development from the For Harode Infrastructures ~..,.,,....,,"'-ru.a...._ P~rhier N.M.R.DA being the Planning Authority under whose jurisdiction the aforesaid Project Is being implemented. 3. The Estimated Cost incurred till date Is calculates to Rs. 79,50,0CX,/- (Total of Table A & B). The Amount of .~mate~_Co st Incurred is calculated on the basis.of input_materials / services used le Yn~. am.<2fJ..f'!~~-fl~m~- 4_ The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specificatio·ns mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs. NIL/- (Total of Table A & B). 5. I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B below: TABLE-A Residential Layout for Kh No 100/1, P.H. no 33, Mouza: Bidgaon, Ta: Kamptee, Distt: Nagpur (to be prepared separately of each Building / Wing / Layout / Plotted Developme nt of the Real Estate Project) Sr. Particulars Amount (In Rs.) No. 1. Total Estimated Cost of Building/ Wing/ Layout/ 75,12,000/- Plotted Development as on date of Registration is 2. Cost incurred as on date of Certificate 79,50,000/- 3. Work Done In Percentage (as Percentage of Estimated 98% Cost) 4. Balance Cost to be incurred•• ((based on Estimated NIL Cost) 5. Cost incurred on Additional/ Extra Items not included In - the Estimated Cost (Table~) TABLE-B Internal & External Developme nt Works in respect ofRegiaterc cl Phase Sr. Particulars Amount (In Rs.) No. 1. Total Estimated Cost of Internal & External - Development Works Including amenities & faclltties In the Layout as on date of Reaistratlon Is 2. Cost Incurred as on date of Certificate - 3. Wort Done In Percentaae (as Percentage of Estimated - . Cost) 4. Balance Cost to be Incurred •• ((based on Estimated - For Harode lnfrastructurea t<.St~ Partnor j I I Cost) _ s. Coit Incurred on Addltlon1I / Ext,. lt,tmt not lncl11t11ul In , the E1tlm1ted Colt (Tabln_:9_~......,.,,.~--:--=-=:e-~ Yourt f1tthfuUv, ~ ,r: ,\,.t>f& f PAL'} rtt, unr, ,~ 1 ' . ' .r ' 1, I,..,, 1I i, (,!Jr1•u111,,q 1.,,J,fl'Jt,,, ,·, , ,,,, • nt NARAYAN ICAMAt.SAO PALSAPURI! rt ,,,,J, /F,IL11,r, 11 f II I I ) ,, ' c,r, GiJH 11.. r,1 1i1 S•, ld ,,,,r1 " 1' Siplture. Hime (IH 8&Da UTTERS) wfJh 6Umo ot En~nM4f /Not lttsl thott l«ltl/lol'1 r,qru Htlldlf"' #Q1HWJ/1nt n, p,.r ~t;JIIHI 7(11} I)/ lh1 #,I/ Local A&dhof~ Uame Humber (It •wflclbMJ SfATf/R/211l2/Al'&/O'ltYl.1 ~~, d rrOlltt:Mf •--=NII.Ill~~ DaU-;3U )3~ l,. Tat~ d ~~IO~ f ~ f.d flil.#N ffl/;f4 if Pf( ·~ll,nf,I jfft/!1/~ -.t'.-e wr..~ f#~~ ~illl» f H/~l'A ~/ 2 ~-, ~s---e , OtR"~ t>/~~, A fl1t(IRMI 1K r.- ~ tltiP#'7/ #lk4'P'WfllFA r~~llelfX ,NUl~~. ..-rADw <,'A:f~-- H,,6#1~ ,_-.~.t;w V/t..,..,_ , i,J~~d ir~~W -llq9f ~~MP '/~1-- Ml!/ff kW~~ ~ g d)f ~ ~~ i"i 6- fM4 ~ ~ ~ a l , ! ~ ti/~--~ ~ , , - ~ ~ f i ! f ? ~ ~ - ~ A ( A ~ ~ i f ~ ~--tlt(Wli tl.~ ~~~~ill-,-,-A~~}- ' ~- P~~~ Cr~1W k~'-') ,rqyn ,-1~,~ A~J?# l~r~ ~&~~ 4!~'2J ~w~~ tWl~/ IAbg1 {,edjc ,~~~~ k>~~=ato~~~--'~~~~,'1"~~~--~,- 1 : t l ~ ~ d~JfJ#J f' f i N ~ 4 - ~ ~ ,c,rnr~/~ ~Jor~<#, , ~?J H a : ~ ~ ~ _,_,,,, ~~ '//,~. fP,-~-w I : : )incurred on Adcfltional / Extn Items not included in the Estimated C.ost (Tat>le-C) I- j Yours faithfully, NARAYAN lCAMAlSAO PALSAPURE Signature & Name (IN Bl.OCX LETTERS) with Stamp of Engineer [Nat less than ~ s ~ ~ o r ~ as~ SectbJ lfu} of tbt! ActJ Local Authority License Number (if applicable) SfATE/R/2022/APl/02027 •eed & Accepted by: Signature of Promoter Name: ARUN NAMDEORAO HARODE Date: 31.03.2024 Note: L The scope of work is to complete Registered Real Estate Project as per drawq:s appaoved from time to time as per specifications mentioned in the Agreement of Sale. 2. (•) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be refaed up on by Eugfnc:c:r. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marted (•) & in case: quantity are being calculated by office of Engineer, the name of person in the office of Engine.er, who is responsible for the qmntly calculated should be mentioned at the place marked (•). 3. (••) Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost (1) & actual Cost Incurred (2) due to deviation in quantity required/ escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred / to be incurred. For Harode Infrastructures ~~,~~ P~rh,or exhaustive 4. All components of work with specifications are indicative & not le: Any deviation In input 5. Please specify if there are any deviations / qualifications. Examp material used from specifications In Agreement of Sale. TABL E-C List of Extra / Additi onal / Delete d Items consid ered in the Cost (Whic h were not parts of the origin al Estim ate of Total Cost) list of Extra / Additional/ Deleted Items Amount (in Rs.) Sr. No. 1. 2. for Harode Infrastructures 1l.{lt ~ Partner