Annex ure-B FORM -2 (See Regula tion 3] ENGINEER'S CERTIFICATE (To be submit ted at the time of Registr ation of Ongoin g Project and for Withdr awal of Money from Design ated Bank Accoun t - Project wise) Date: 31.12.2023 To, M/s Harode Infrastructure Partner. Shri Arun Namdeorao Harode 32,33, Netaji Nagar, Bhandara Road, Nagpur Subject:Certificate of Cost Incurred for Development of Harode Infrastructure "Goverdhan Nagari-11" having MahaRERA Registration Number 50500050093 being Developed by M/s Harode Infrastructure, Partner. Shri Arun Namdeorao Harode Netaji Nagar, Bhandara Road, Nagpur Sir, I N.lt Palsapure have undertaken assignment of Certifying Estimated Cost for Harode Infrastructure •Goverdhan Nagari-11", Residential Layout for Kh No 100/1, P.H. no 33, Mouza: Bidgaon, Ta: Kamptee, Distt Nagpur having MahaRERA Registration Number 50500050093 being Developed by M/s Harode Infrastructure 1. I have estimated the cost of Civil, MEP and Allied Works required for complet ion of the Layout & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / Consultants. The Schedule of Items & Quantity required for the entire work as calculated by N.K. Palsapure Quantity Surveyo,.. appointed by the Developer/Engineer, the assump tion of the cost of material, labour & other inputs made by the Developer, and the Site Inspecti on carried out by us to ascertain / confirm the above analysis given to us. 2. we estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 7S,12,000/- (Total of Table A & B) at the time of Registra tion. The estimated Total Cost of Project is with reference to the Civil, MEP & Allied Works completion of the apartments & proportionate completion of Internal & external works, as per the specifications mentioned In the Agreement of Sale & for the purpose of obtaining Occupa tion Certificate / Completion Certificate for the Bulldlng(s) / Wing(s) / Layout / Plotted Develop ment from the For Harod e Infrast ructur es ~~~~ -:::> \.LS t~ Partner N.M.R.DA being the Planning Authority under whose jurisdiction the aforesaid Project ls being implemented. 3. The Estimated Cost Incurred till date is calculates to Rs. 75,20,CXKJ/- {Total of Table A & 8). The Amount of .~im~.~~L~~!.l.Q~~~-~-~-~Jg1J1~J?.r:a.!~~--~~l~.gf_!mu1t.m~~rJ~l~.L~~-t~.& ~J~~n.~tth~~-,~~- 4. The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid Project Is @Stimated at Rs. Nil/- (Total of Table A & 8). 5. I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & 9temal works, as per the specifications mentioned in Ag~ment of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & 8 below: Residential Layout for Kh No 100/L P.H. no 33. Mouza: Bidgaon. Ta: Kamptee. Distt: Nagpur (to be prepared separately of each Building / Wmg / Layout / Plotted Development of the Real Estate Project) Sr. Particulars Amount (In Rs.) No. L Total Estimated Cost of Building/ Wing/ Layout/ 75,12,(DJ/- Plotted Development as on date of Registration is 2.. Cost incurred as on date of Certif,cate 75~0,0CX1/- 3. Wort Done in Percentage (as Percentage of Estimated 95" Cost) 4. Ba~nce Cost to be incurred • • ((based on Estimated Nil Cost) 5. Cost incurred on Additional/ Extra Items not induded in - the Estimated Cost {Table-C) TABLB-B Internal & External Development Works in respect of Registered Phase Sr. Partiallars Amount (in Rs.) No. 1. Total Estmated Cost of Internal & Extern1I - DeYelopment Works induding 1menities & facilities in the Layout 1s on date of R~lstration ls 2. Cost incurred as on date of Certificate - 3. Wort Done in Percentap (1s Percentage of Estima~ - Cost) 4. Balance Cost to be incurred•• ((based on Estimated . For Harode Infrastructures '~ '- Pn'1ner ► ---- ---- ---- ---- ---- ---- -.., Cost) 5. Cost incurred on Additiona l/ Extra Items not induded in - the Estimated Cost (Table-c) Yours faithfully, NARAYAN KAMAL.SAO PAlSAPURE Signature & Name (IN BlOCK LETTERS) with Stamp of Engineer /NOtles'S man 8ra:W»"s ~Helde oreqaiwJl,t tttas~Seaio a2(u}oftMk 1] Local Authority License Number (if applicable) STAT£/R/2022/APL/0202.7 Agcccd & Aa:epted bv: Signature of Promoter Name: ARUN NAMDEORAO HARODE Date: 31.122023 L The scope of won is to complete Registered Real Estate Project as per drawiaigs approved from time to time as per specificatiolas mentbaed in the Al}eemen t of Sale. 2- (•) Quantity Survey can be done by the office o f ~ or can be done by~ • ~ • a.mmty Surveyor. who's Ceftffic:ate of Quantity Cilauted. can be relied up on by &apca. In case of independe nt quantity surveyo r~ appoillted by DeYeloper. the name Im to be me:allticJll ed. the puce nmted r·, & In case quantity are beq c.alcufated by office al Engineer, the name of person in the office of Engineer. who is responsiJle for the qumtity calauted should be meltiolaed at the place marled(*). 3. (•-J Balance Cost to be incum!d (4) may va,y from diffeffle between Total Estimmd Cost (1) & Ktual Cost mcurred (2) due to deviation in quantity required/ eso••eon of mst etc. As this is an Estimated Cost any deviation quantit-; .equiled for the Development al 11ml Esbte Project wil result in an amendmen t of~ cost incurred/ to be incurmt For Harode Infrastru ctures ~~'~ ~ Pam,er i 4. All components of work with specifications are indicative & not exhaustive S. ~ specify if there are any deviatJons / qualifications. Example: Any deviation in input material used from specifications In Agreement of Sale. TABLE-C List of Extra / Additional / Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) Sr. No.. list of Ema / Additional / Deleted Items Amount (in Rs.) L 2.. For Harode Infrastructures ~~~~p I LOI~ Partnor