-· Annexure A FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registratio n of Ongoing Project & for Withdrawa l of Money from Designated Account) Date: 31.03.2024 To, M/s Harode Infrastructure, Partner: Shrl Arun Namdeorao Harode Netajl Nagar, Bhandara Road, Nagpur Subject Certificate of Percentage of Completion of Construction Work of Harode Infrastructure •GOVERDHAN NAGARl-11" having MahaRERA Registration Number 50500050093 being Developed by M/s Harode Infrastructure, Partner: Shri Arun Namdeorao Harode. Sir, I N. K. Palsapure have undertaken assignment, as Licensed Engineer of Certifying Percentage of Completion of Construction Work of Harode Infrastructure "GOVERDHAN NAGARl-11" Residential Layout for Kh no 100/1, P.H. no 33, Mouza: Bidgaon, Ta: Kamptee, Distt: Nagpur having MahaRERA Registration Numbe'r 50500050093 being Developed by M/s Harode Infrastructure Based on the Site Inspection, with respect to the Layout of the aforesaid Real Estate Project I certify that as on date of this Certificate, the Percentage of Work Done for each of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed In Table-8. TABLE-A Residential Layout for Kh no 100/1, P.H. no 33, Mouza: Bldgaon, Ta: Kamptee, Dlstt: Nagpur (to be prepared separately for each Layout/Building/Wing of Project) Sr. Tasks / Activity Percenta1e of Actual Work No. Done (As on date of the Certificate) (1) (2) (3) 1. Excavation Not Applicable 2. Basements (If any) Not Applicable For Harodo Infrastruc tures 1£9<'t-, Pormor . -_ ,. ~ •• ..... Podlunu ttf '"V) Pllnth Not Appllcabl~ Not Appllc1ble 5' Stllt Floor Not Appllcable "7, Sllb ot Su~r Stnacture lnttrnal WIits. ln~m•I Pfister, Floortnas. Doors. windows Not' Appllcable Not Applicable ~In Flats} "-mlsts L Slnltinv Flttf!\ss wlthln Flats / Premises Not Applicable 9. Stal~•se~ lift Wells & lobbies 1t e•ch Floor Level Overhead Not Appllcable and Underground Water Tanks 10. ~mil Piumblre & ~tem1I Plaster. Elev1tlo~ Completion Not Applicable of Temices. with w1terprooflng of the Bulldlng / Wing 11. lnstlllltlon of lifts. Water Pumps. Fire Flahtlna Flttlnas and Not Applicable Equipments IS per CFO NOC. Etectrk1I flttlnas. MKh1nlc1I Equll)fflent_s. Complllnat to conditions of Environment / CRZ NOC. Fl'nlshlrc to Entnnc:e lobby/s. Pllnth Protectlo~ P1vlna of ArNs 1ppurte-n1nt to 8uUdlna/Wlna, Compound WIii and 111 other requtrements as m1y be required to complete Project as per specifications to Aaretment of SIie, Any other ActMtitS- TABLB--8 Common ArNs (lntemal & £xtemal Development Works) In respect of the Registered Phase / Project ~ Sr. Commoft ANas. Fadlltles Proposed Pen:entqe of actual Work Details No. (Yes/NO) Done . (As on date of Certificate) (1) (2) (3) (4) (S) L lntffl\al Rolds & Footpaths Yes 1~ 2. water Suppty Yes 100K 3. Sewenp (Chamber. Unes. Septk Yes 1~ Tanlc. STP) 4. Strom Water Drains Yes 100K 5. Landsap~ a Tree Plantlnt Ye,s 100K 6. Strfft Uahtlng Yes 9°" 7. Community BuUdlnas No - 8. Treatment a Dkposal of Sewap Ind Yes 100K Sullaae Water 9. a Solid Waste M1n11ement Dlsposal No - 10. Water Conservation / Rlln Water Yes 1009' Harvestlna 11. Enerav Manaaement No . 12. Fire Protection & Fire Slfety No . \ requirements 13. Electrical Meter Room. Sub-Station, No - Receiving Station 14. Others (Option to Add mort) Yes 100K For Hmrodo lotrostructurea -c:- ~~,ua_r,_. Pnrtnor compound Wall to Recreational Open Space Yours faithfullv, (NARAYAN KAMAL.SAO PALSAPURE} "G ~ ,- Signature & Name (IN BLOCK LITTERS} of PALS~P~AE & A.SSOCIATES Licenced Engineer Consult rg c.-1g,r,s:p, Pr~icct,.. license Number (STATE/R/2022/APl/02027) - - • ..J - "onsuItan\ Regd. Valuer, Interior Designer ~E. SURYA UAGAR, NAGPUR. a ~ & N:Cepted by: Signature of Promoter Name: ARUN NAMDEORAO HAROOE Date: 31.03.2024 For Har odc lntraatructures