AnnexureA FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (I'o be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 30.09.2023 To, M/s Harode Infrastructure, Partner. Shri Arun Namdeorao Harode Netaji Nagar, Bhandara Road, Nagpur Subject: Certificate of Percentage of Completion of Construction Work of Harode Infrastructure •GoVERDHAN NAGARl-11" having MahaRERA Registration Number 50500050093 being Developed by M/s Harode Infrastructure, Partner: Shri Arun Namdeorao Harode. Sir, I N. K. Pal.sapure have undertaken assignment, as Licensed Engineer of Certifying Percentage of Completion of Construction Work of Harode Infrastructure "GOVERDHAN NAGARl-11" Residential Layout for Kh no 100/1, P.H. no 33, Mouza: Bidgaon, Ta: Kamptee, Distt: Nagpur having MahaRERA Registration Number 50500050093 being Developed by M/s Harode Infrastructure Based on the Site Inspection, with respect to the Layout of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-8. TABLE-A Residential Layout for Kh no 100/1, P.H. no 33, Mouza: Bldgaon, Ta: Kamptee, Distt: Nagpur (to be prepared separately for each Layout/Bulldlng/Wlng of Project) s,. Tasks / Adlvlty Percentage of Adual Work No. Done (As on date of the Certificate) (1) (2) (3) 1. Excavation Not Applicable 2. Basements (If any) Not Applicable For Harode Infrastructures ~,@~~.,_ Partnar I ! 3. Podiums (if any) Not Applicable 4. Plinth Not Applicable s. Stilt Floor Not Applicable 6. Slab of Super Structure Not Applicable 7. Internal Walls, Internal Plaster, Floorings, Doors, windows Not Applicable within Flats/ Premises 8. Sanitary Fittings within Flats / Premises Not Applicable 9. Staircases, lift Wells & Lobbies at each Floor Level Overhead Not Applicable and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion Not Applicable of Terraces, with waterproofing of the Building/ Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and Not Applicable Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activities. TABLE-B Common Areas (Internal & External Developmen t Works) in respect of the Registered Phase / Project Number Common Areas & Fadlltfes Proposed Percentage of actual Work Details Sr. No. (Yes/ NO) Done (As on date of Certificate) (1) (2) (3) (4) (S) 1. Internal Roads & Footpaths Yes 100% 2. Water Supply Yes 90% 3. Sewerage (Chamber, Lines, Septic Yes 90% Tank, STP) 4. Strom Water Drains Yes 100% 5. Landscaping & Tree Planting Yes 75% 6. Street Lighting Yes 80% 7. Community Buildings No - 8. Treatment & Disposal of Sewage and Yes 75% Sullage Water 9. Solid Waste Management & Disposal No - 10. Water Conservation / Rain Water Yes 100% Harvesting 11. Energy Management No - 12. Fire Protection & Fire Safety No - requirements 13. Electrical Meter Room, Sub-Station, No - Receiving Station 14. Others (Option to Add more) Yes 10Cm For Harode Infrastruc tures ~){_~- Partner [_ _ _.ll_~Co'..em=!.!...=.tpou~n~d=----W-a_n_to Open Space __ Rec_re_a_t1_on-:-a-lLI __ _ _---1_ _ _ _ _ _ _ _ _ _...___ _ ___,I_. r Yours faithfully, r ~{2\~ PALSAPURE & A~SOCrATES Consultrng Engineer, PrcJect Consultant (NARAYAN KAMALSAO PAlSAPURE) ~~.9d, Valuer, Interior Gcsigner Signature & Name (IN BLOCK LITTERS) of Ucenced Englnw, SURYA NAG AR, r~AGPUR - 8 License Number (STATE/R/2022/APL/02027) Agreed & Accepted by: Signature of Promoter Name: ARUN NAMDEORAO HARODE Date: 30.09.2023 For Harode Infrastructures g;;;»-,,1t.._/lt'~~ Partner