5,rqfuq;r{1qqftr65,r+m FORM 2 ENGIN EER'S CERTIFICATE (To be submitted at the time of Registration of ongoing project and for withdrawal of Money from Designated Account- project wise| Date: .A9104/2An. To, The Muncipal Council Katol, Through chief officer Mr. Dhananjay Rajaram Borikar, Tahsil- Katol, District Nagpur - 44t3OZ. Subject: Certificate of cost lncurred for Development of p.lvl.A.y. scHEME TOWER AL 42 EWS DWELLING UNIT CITY SURVEY 806 TAH KATOL DISTT NAGPUR A.H.P with survey No g06, Taluka - Katol and Distt Nagpur for residential purpose having Survey No 805, Taluka - Katoland Distt Nagpur being developed by P.M-A.Y. Muncipal Council Katol, Through Chief officer Mr. Dhananjay Rajaram Borikar Sir, t' l/We, have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being-l Buifding(s)/ Wine(s) of the First Phase situated having Survey No E06, Taluka - Katol and Distt Nagpur admeasuring 9,900 sq.mts. area being developed by M/s. P.M.A.Y. Muncipalcouncil Katol, Through Chief Officer Mr. Dhananjay Rajaram Borikar 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEp and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Er. Rajendra K. Kale quantity surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. :3. we estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 3,34,0!,39g/- (Total of Table A & B). The estimated Total Cost of project is with reference to the Civil, MEp and allied works required to be compreted for the purpose of obtaining occupation certificate / completion certificate for the building(s) from Muncipal Council Katol which is authority under UDCPR project Approving Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated cost Incurred till date is calculated at Rs. 93,52 ,3gt.44/- (Total of Table A & B). The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5;. The Balance cost of Cormpletion of the Civil, MEP and Allied works of the Building(s) of the subiect project to obtain Occupation Certificate /Completion Certificate from The Assistant Director Town planning Authority Nagpur Munilcipal corporation (NMc) is estimated at Rs. 2,40,49,006.55/- (Total of Table A & B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLE A layout Plan or called P.M.A.Y. Scheme Tower A1-42 EWS dwelling unit City survey 805 Tah katol Distt Nagpur A.H.p with survey No gOG, Taluka Katol- and Distt Nagpur (to be prepared separately for each Building Ailing of the Real Estate project) Sr. Particulars Amounts No 1. lotal Estimated Cost of Building/Wing as on Rs. 3,34,01,398/- 09/04/2023 date of Registration. 2 Cost incurred as on Rs. 93,52,391,.44/- 09/04/2023 (based on the Estimated cost) 3. Work Done in percentage 28% (as percentage of the Estimated Cost) 4. Balance Cost to be lncurred Rs. (Based on Estimated Cost) 2,40,49,006.56/- 5. Cost Incurred on Additional/Extra ltems as on /- not included in Estimated Cost TABTE B (to be prepared for the entire registered phase of the Real Estate Project) Amounts Total Estimated cost of the f niern-a anA External Development Works including amenities and Facilities in the layout as on date of Registration Cost Incurred as on on the Estimated Cost) Work Done in percentage 1as - Percentage of the Estimated Cost) Balance Cost to be Incurred {Based on Estimated Cost} Cost Incurred on Additional Extraltems ET.IASENDRA KAue Engineer n License Number n-ffiine*,r l "r' +,..-flefl luni.,,.. -".-..,iiatol ifE r I \){- Namr-' \p. M.AY. vt u trtct pAL CO U NCt L KATOL $. \\ Through chief officer Mr. Dhananjay Rajaram Borikar Date: 9/04/2023 Note: 1. The scope of work is to complete Registered Real Estate project as per drawings approved from time to tirne as per specifications mentioned in the Agreement to Sale. z' t*) Quantity survey can be done by the office of Engineer or can be done by an inclependent Quantity Surveyor, who,s Certificate of euantity Calculated, can be relied up on by Engineer. In case of independent quantity surveyor being appointed by DeveloPer, the name has to be mentioned at the pface marked (*) & in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quanlity calculated should be mentioned at the place marked (*). 3' (**) Balance cost to be incurred {a) may vary from difference between Total Estimated cost (1) & actual cost incurred (2) due to escalation of cost etc. As this is an Estimated cost / deviation in quantity required any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred / to be incurred. 4' All components of work with specifications are indicative & not exhaustive 5' Please specify if there are any deviations qualifications. I Example: Any deviation in input materiai used from specifications in Agreement of sale. TABLE - C List of Extra / Additional / Deleted Items considered in the Cost (Which were not rts of the Estimate of Total S. No. List of Extra / Additional / Deleted Amount (in Rs.) Items L. 2.