Annexure A Percentage of actual S. Proposed Common Areas & Facilities Work Done(As on date Details No. (Yes / NO) of Certificate) 1 2 3 4 5 1 Internal Roads & Footpaths NO NA 2 Water Supply YES 30% 3 Sewerage (Chamber, Lines, Septic Tank, STP) YES 40% 4 Strom Water Drains YES 0% 5 Landscaping & Tree Planting YES 0% 6 Street Lighting NO NA 7 Community Buildings NO NA 8 Treatment & Disposal of Sewage and Sullage Water YES 38% 9 Solid Waste Management & Disposal YES 38% 10 Water Conservation / Rain Water Harvesting YES 28% 11 Energy Management YES 0% 12 Fire Protection & Fire Safety requirements YES 0% 13 Electrical Meter Room, Sub-Station, Receiving Station YES 0% 14 Others (Option to Add more) Percentage of actual S. Proposed Tasks / Activity Work Done(As on date Details No. (Yes / NO) of Certificate) -1 -2 -3 -3 1 Excavation Yes 100% 2 Basements (if any) No NA 3 Podiums (if any) No NA 4 Plinth Yes 100% 5 Stilt Floor Yes 75% 6 Slab of Super Structure Yes 53% Internal Walls, Internal Plaster, Floorings, Doors, windows within Flats 7 Yes 53% / Premises 8 Sanitary Fittings within Flats / Premises Yes 30% Staircases, Lift Wells & Lobbies at each Floor Level Overhead and 9 Yes 40% Underground Water Tanks External Plumbing & External Plaster, Elevation, Completion of 10 Yes 30% Terraces, with waterproofing of the Building / Wing Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, 11 Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas Yes 0% appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity