q,rqi{qr{rtqRqqil*{ fucrr wrq* geT{ it --o7i i 2-222101 Email: n.o.katol@email.com 6.{c{I / ctqqg4q / nf4Ed202 11414 i4t'/2023 Annexure A FORM 1 lsee Regulation 3l ARCHITECI'S CERTIFICATE (To be submitted at the time of Registration of Ongoing project & for Wthdrawal of Money from Designated Account) Date: 09lo7 /2023 To, P.M. A.Y. MuncipalCouncil Katol, Chief Officer Mr. Dhananjay Rajaram Borikar, Tashil- Katol, Distrid Nagpur - 441302. Subject: Certificate of percentage of Completion of Construction Work of the project .P.M.A.Y. SCHEME TOWER A1 42 EWS DWELTING UNIT CITY SURVEY 806 IAH KATOL DISTT NAGPUR A.H.p" bearing MahaRERA Registration Number P5O5OOO5O].29 situated on Survey No 806, Taluka Katol, Distt. Nagpur (latitude and longitude of the end points) being developed by p.M.A.y. Muncipalcouncir Kator, Through chiefofficer Mr. Dhananjay Rajaram Borikar Sir, l/ we Er. Rajendra Kale have undertaken assignment as Architect / Licensed su.vevo. of certifying percentage of compretion of construction work of p.M.A,y. scheme Tower Al 42 EWS Dwelling Unit City Survey 806 Tah Katol Distt Nagpur having MahaRERA Registration Number p50500050129 (Only applicable after project Registration) being Developed by being deveroped by p.M.A.y. Muncipar councir Kator, Through chief officer Mr. Dhananjay Raiaram Borikar. Eased on the Site lnspection, with respect to the Layout / each Building/Wing of the afor€said Real Estate project, I certify that as ondate of this Certificate, the percentage of Work Done for each of the Building/Wing of the Real Estate project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the adivity ofentire phase is detailed in Table-B. TABIE.A Layout / Building / Wing Number _ {to be prepared separatety for each LayouVBuilding/Wing of project) s. Task / Activity Pe(centage of Actual Wo* No. Done {As on date of the Certificatel (1) et.------..------.--------- lcl 1. txcavatton LOe/o 2. Basements (if any) o% 3. Podiums (ifanv) o% 4. Plinth 100% Stilt Floor 5Mo 6. Il"b;f s,rper str|',"tu,€ 30% 7. Inrernat Wa s, lnternal plaster, Floorings, Doors, 3V/o windows within Flats / premises 8. 5anrtary Fttings within Flats / premises 30% q )Ialrcases, Llft Wells & Lobbies at each Floor Level 10% gyerhe?d_?nd !nderground Water TanlG Externat Ptumbing & External plaster, Elevation. 30% Completion of Terraces, with waterproofing of the Building / Wing 11. Insta atton of Lifts, Water pumps, Fire Fighting oyo Fittings and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, plinth protection, paving ofAreas appurtenant to Building/Wing, Compound Wall and all other requirements as may be requrreo to complete Project as per specifications toAgreement of Sale, Any other Activitv *Note: - The Above table is not applicable ro our project since we are under plotted Layout not Building constructions. TABTE-B Common Areas (lnternal & External Development Works) in respect of the Registered Phase / Project Number s. Common Areas & Facilities Proposed Percentage of Details No. (Yes / actual Work Done NO) (As on date of Certificate) (1) (21 (3) (4) (s) L. lnternal Roads & Footpaths NO oo,4 As per Rules 2. Water Supply YES 33./" As per Rules 3. Sewerage lChamber, t_ines, YES 33"/" As per Rules Septic Tank, STp) 4. )rrom Water Drains NO NA NA 5. La ndscaping & Tree planting NO 0% NA 6. 5rreet Ltghtang NO NA NA 7. Community Buildings NO NA NA 8. Ireatment & Disposal of YES 33% As per Rules Sewage and Sullage Water 9. Solid Waste Management & YES 33% As per Rules Disposal 10. warer conservation / Rain YES 33% As per Rules Water Harvesting 11,. Energy tvtanagement YE5 o% As per Rules 1,2. Fire Protection & Fire Safety YE5 o% As per Rules requ trements 13. Electrical Meter Room, Sub- YES oo/o As per Rules Station, Receiving Station 14. YouR Faithfully (? Er. Rajendra Kale Y----..'q (License No., 4rr"=:n:r- ||uni. . ...-,' Xatd by ncil Katol Mr. Dhananjay Rajaram Borikar Place: Katol, Nagpur .@ Datet 09/07 /2023