1 FORM 1 [.9ee Regulation 3] ARCHITECT'SCERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) For the quarter ended on 30'h June, 2019 Date: 05'h fuly, 2019 To, Badjate Real Estate Pvt. Ltd., Shop no.01 & 02, Sant gadge Maharaj Dharamshala, Medical Square, Nagpur 400010 Subject: Certificate of Percentage of Completion of Construction Work of "Ciry center-2" project p50500003g6g for the Construction of one commercial Building situated on the Plot [Maha RERA No. No. X-102/2 admeasuring about 6,144 sq. mtrs., of Mouza Rengapar, within the limits of Nagpur Municipal Corporation & Nagpur Improvement Trust, Butibori, MIDC, Tahsil & District - Nagpur by its boundaries as below, being developed by M/s Badjate Real Estate Pvt' Ltd' demarcated On the East: Plot no. X-10213 On the West: Plot no. X-102/l On the North:Road On the South: Plot no. X-102/4 Sir, I/ We have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Building situated Completion of Construction Work of the one Building of the Project "City center-2", on the plot No. X-lO2/2 admeasuring about 6,144 sq. mtrs., of Mouza Rengapar, within the limits of Tahsil & District - Nagpur Municipal corporation & Nagpur Improvement Trust, Butibori, MIDC, Pvt' Ltd' N"!po, demarcated by its boundaries ,, b"Io*, being developed by M/s Badjate Real Estate T 2 On the East: PIot no. X-102/3 On the West: Plot no. X-102/1 On the North:Road On the South: Plot no. X-10214 1. Following technical professionals are appointed by Owner / Promoter :- i. Shri Bhavik. M. Jain as Architect ii. M/s. P. T. Mase & Associates as Structural Consultant iii. Shri Anil sakhare as a Site Supervisor 2. Based on Site Inspection, with respect to each of the BuitdingAVing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingflVing of the Real Estate Project as registered vide . P50500003869 number under Maha RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in the Table B TABLE-A Building AVing Number 01 (to be prepared separately for each Building A[ing of the Project) Sr. No. TasV Activity (2) Percentage of (1) work done (3) 1 Excavation 100o/o 2. 01 number of Basement(s) and 1 Plinth 100o/o 3. ... number of Podiums NA 4. Stilt Floor NA 5 04 number of Slabs of Super Structure 600/o 6. Internal Walls, Internal Plaster, Floorings within 30o/o Flats/Premises, Doors and Windows to each of the Flat/Premises. 7 Sanitary Fittings within the FlaVPremises, Electrical Fittings 10o/o within the Flat/Premises. 3 8. Staircases, Lifts Wells and Lobbies at each Floor level 35o/o connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 0o/o completion of terraces with waterproofing of the Building/Wing. 10 Installation of lifts, water pumps, Fire Fighting Fittings and 0o/o Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /cRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas aPPurtenant to Building/ wing, compound wall and all other requirements as may be required to obtain Occupation / Completion Certificate. TABLE-B Internal and external Development'Works in respect of the entire Registered Phase. sl. Common areas and Facilities, Proposed Percentage of Details No. Amenities (Yes/I.Io) Work done (s) (1) (2) (3) (4) 1 Internal Roads & Foot- ths. No 2 Water Su Yes Oo/o 3 Sewerage (chamber, lines, Yes 0o/o Septic Tank, STP) 4. Storm Water Drains No Yes 0o/o 5. Landscaping & Tree Planting. No 6. Street No 7 Community Buildings No 8. Treatment and disposal of and water No 9 Solid Waste & 4 I Disposal. 10 Water conservation, Rain water Yes 0o/o harvesting. 11 Energy management No 12 Fire protection and fire safety Yes 0o/o requirements 13 Electrical meter room, sub- Yes 10o/o station, receiving station. 74 Others (Option to Add more). Yours Faithfully, B& BHAVIK M. IAIN Signature & Name (IN BLOCK LETTERS) of L.S/ Architect (License No. Cd20 1 7 / 82531)