FORM-2 ENGINRER'S CERTIFICATE Date:11.08.2021 To ADISUN EUILDCON PVT.ITD. G1,RPTs ROAD, LAXMI NAGAR, NAGPUR-440022 Subject : Certificate of Cost lncurred for Development of BU -DtNG for construction of ADTSUN AVENUE which is situated on the Plot bearing number 26, Khasara Number 11 & 12, Mouza PARSOOI , City Survey Number 193 , oivision NAGPUR oemarcated by its boundaries (latitude & longitude of the end points) 21 DEGREE 07'15.47"N latitude and 079 degree 02,.29.51"E longitude to the North 21 degree 07'15.11"N latitude and 079 degree02'30.64"E to the East, 21 detree 07,1S.47N latitude and OZ9 de$ee 02'29.51' E to the West, 21 degree 07'74.73" latitude and 079 degree 02,30.19"e longitude to the South , Natpur, oistrict Nagpur admeasuring 540 sq. mts. Area beint developed by ADTSUN BUILDCON PW.I.TD. Ref :-MahaRERA Registration No. P5050q)28243. 5ir, l, RAJESHWAR NAMYAN IOSHI , have undertaken assignment of certiryint estimated cost for the Subject Real Estate Project proposed to be registe.ed under MahaRERA beint situated on plot bea.ing number 26, Khasra Number 11 & 12, Mouza_pARSODl, City Survey Number 193, Na8pur admeasu.int 540 sq. mtsArea being developed by ADTSUN BUtLDCON pVT.t-TD. 1 Following technical professionals are appointed byOwner/promoters:- (D M/s SKA CONSORTIUM as Architect; (ii) M/s PATANKAR CONSUI-TANTS PW.|-TD. as StructuratConsuttant: (iii) MR.N.M.DESHKAR as MEp Consuttant; (iv) MT.RAJESHWAR JOSHI as Site supervisor; 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Compilation certificate if the civil MEP and Allied works, of the layout ofthe project. ourestimated cost calculations are based on the Drawings/ plans made available to us. For the project under reference by the Developers and consultants and the schedule of items and quantity Surveyor. ofthe items and quantiw forthe entire work as calculated by l quantity surveyor* appointed by the Engineer, and the assumption \ *r1 of the cost of material labour and other inputs made by developeE, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the layout of the aforesaid project under refe.ence as Rs. 1,50,0O,m0.00 (Total of Table A and 8). The estimated Total Cost of project is with reference to the Civil, MEP and allied works require to be completed for the purpos€ of obtainint occupation certificate / completion certificate fo. the buildint(s) from the NAGPUR MUNtCtpAL CORPORATION beint the planning Authority under whose jurisdiction the aforeiaid p.oject is beinS implemented. 4. The Estimated Cosr tncurred tilt date is catcutated at Rs 67,25,563.@ (Totat of Table A and B). The amount of Estimated Cost tncurred is calculated on the base of amount of Total Estimated Cost. 5, The balance cort of comptetion of the Civil MEp, and Allied works of the Building{s} of the subiect pro.iect to obtain Occupation Certificate / Completion certificate from NAGPUR METROPOUTAN REGIONAL DEVELOPMENT AUTHOR|TY (planning Authortty) is estimated at Rs. 82,74,437.@ {Totat of Table A and 8), 6. certify that the cost ofcivil MEp and allied work forthe aforesaid project as compreted on the date of his certificate is as given in Table A&Bb€low: TABIE A Building /Wing bearing Number O1 or caIed ADTSUN AVENUE (to be prepared separately for each Building/Wing ofthe Real Estate project) St. Porticulots Amounte (Rs,) 7 TotalEstimated cost ofthe buildinB/wing as on 10.08.2021 1,s0,00,000.00 date of Redstration is 2 Cost incurred as on 10.08.2021 (Based on the Estimated 6725s63.00 cost) 3 Work oone in Percentate (as percentage of the estimated 45% cost) 4 Balance Cost to be lncurred gBased on the Estimated Cost) ss% Cost lncurred on Additional/Extra ttems as on 10.08.2021 82,74,437.00 not included in the Estimated Cost (Annexure A) \*-*l TABLE B (to be prepared for the entire retistered phase ofthe Real Estate proiect) Sr. No Porticulort Arnounts (Rs.) 1 Total Estimated cost of the tnternal and Exter;;i Development Works including amenities and Facilities in the project as on 11.(8.2021 date of Registration is L8.02.202L 2 cost incurred as on 11.08.zor18;;;;n ih; Estim ;o N.A. cost) 3 Work Done in Percentage 1as eeicenGge oithe estimited cost) 4 Ealance Cost to be tncurred (Based on the EstimateA Cosg N.A. 5 Cost lncurred on additional/Extra ttenrs as on 31.(A.2O21 not included in the Estimated Cost (Annexure A) N.A. \ SIGNATURE OF r-3 7 )F SITE EN6INEER } (NAMEt ISHTNAqUE NAIM)