FORM-2 (See Reguletion 3) . ENGINRER'S CERTIFICATE Dateio2.o2.202L To M/s AdisunBuildcon Private timited, Q-1, LaxmiNaSar, Negpur 440 022 Subject: Certificate of Cost tncurred for Development ofADISUN AVENUE for sale of Ftats on plot which issituated atPlot No 26, Naik Layou! Subhash Nagar, Nagpur 440 022, Mauzaparsodi, City Survey No 193, Nagpur Demarcated by its boundaries (latitude & longitude ofthe end points) 21 07 15.47"N to the North 79 02 29.51F to the South 21 07 15.84N to 79 02 30.G4 E to the East 79 02 29.98F to the West of Nagpur on plot No 26, Naik Layout, Subhash Nagar, Nagpur 440 022, MautaPalsodi, City Survey No 193, Nagpuradmeesuring 540 Sq. mts. Area being developed by M/s . ADISUN BUILDCON PVT, LTD. Ref:-MahaRERA Registration No. Apptication For Registration of New project. Sir, l, ISHTIYAQUE NAIM , Consulting Englneerhave undertaken assignment of certifying estimated cost for the Subject Real Estate project proposed to be reSistered under MahaRERA beingsituated on the Plot No 25, Naik Layout, Subhash Nagar, Nagpur 440 022, Mauzaparsodi, Clty Survey No 193, Nagpuradmeasuring 540 sq, mts. area being devetoped by M/s AD|SUN BUTLDCON pW. tID. 1 Following teah n ical professionals are appointed by Owner/promotersr- (i) s K a coNsoRTtuM as Architect; (ii) PATANKAR CONSUTANTS PW.LTD. as Strudurat Consultant; (iii) N,DESHKAR as MEp Consuttant; (iv) RAJESHWARNARAYANJosHtasSitesupervisor; \ )*--i 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Compilation Certificate if the Civil MEP and Allied works, of the layout of the proiect. Our estimated cost calculations are based on the Drawings/ plans made available to us. For the project under reference by the Developer5 and consultants and the schedule of items and quantity SurveYor* of the items and quantity for the entire work as calculated by O1 quantity surveyor* appointed by the EnBineer, and the assumption of the cost of material labor and other inputs made bY developers, and the site inspection carried out bY Lrs. 3. We estimate Total Estimated Cost of completion of the layout of the aforesaid project under reference as Rs. 1,5O,OO,OO0/ (Total ofTableAandB). The estimated Total Cost of project is with reference to the Civil. MEP and allied works requlre to be completed for the purpose of obtaining occupation certificate / completion certificaie for the development of layout from the Nagpur MetropolitanResionDevelopmentAuthoritybeingthePlanningAuthorityunderwhosejurisdi.tion Ine afo'erdrd proie( t ,s berrg implP r^4ted The 4. The Estimated cost lncurred till date is calculated at Rs 31,20,000/- (Total of Table A and B)' amount of Estimated cost lncurred is calculated on the base of amoLlnt of Total Estlmated cost' 5.ThebalancecostofcompletionoftheCivilMEP,andAlliedworksoftheBuilding(s)ofthesubject project to obtain Occupation Certificate / Completion certificate from Nagpur Metro Region Development Authority (old NIT) is estimated Rt, 1,18,80,000 (TotalofTable A and 8)' 6. Certify that the cost of Civil MEP and allied work for the aforesaid Project as completed on the date of his certificate is as Siven ln Table A & B belowl TABLE-A Building No 01 5r. Particulars Amount No 1 TotalEstimated cost ofthe project as on date of Registration 15,000,000.00 2 Cost lncurred as on 02'02-2021 3,120,000.00 3 Work done in percenta8es (based on the Estimated Cost) 20.804,4 4 Balance Cost to be Incurred (based on the Estimated Cost) 11,880,000.00 t Cost lncurred on Additional /Extra ltems as on 31-07-2017 not included ln the estimated cost (Annexure A) SignAture of Enaineer )r-J (rsrrieque r.rArrn) BE (civil) [icence Number Not Applicable