FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE Date: 06/04/2026 To, IMPERIAL GRUH NIRMAN SAHAKARI SANSTHA RH-20, BUTIBORI INDUSTRIAL AREA, BUTIBORI, NAGPUR-441108 Subject: Certificate of Percentage of Completion of Construction Work of IMPERIAL HEIGHTS having MahaRERA Registration no. P50500012942 being developed by IMPERIAL GRUH NIRMAN SAHAKARI SANSTHA NAGPUR. Sir, I/ We Mr. Manish Radheshyam Khobragade have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of IMPERIAL HEIGHTS, having MahaRERA Registration no. P50500012942 being developed by IMPERIAL GRUH NIRMAN SAHAKARI SANSTHA NAGPUR. Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for the building of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building Number WING-G Sr. Tasks /Activity Percentage No of work done 1 Excavation 100% 2 Basements Nil 3 Podiums (if any) Nil 4 Plinth 100% 5 Stilt Floor 100% 6 Slabs of Super Structure 100% 7 Internal walls, Internal Plaster, Floorings, Doors and 100% Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises 100% 9 Staircases, Lifts Wells and Lobbies at each Floor level, 100% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 100% completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. Table A Building Number WING-H Sr. Tasks /Activity Percentage No of work done 1 Excavation 100% 2 Basements Nil 3 Podiums (if any) Nil 4 Plinth 100% 5 Stilt Floor 100% 6 Slabs of Super Structure 100% 7 Internal walls, Internal Plaster, Floorings, Doors and 100% Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises 100% 9 Staircases, Lifts Wells and Lobbies at each Floor level, 100% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 100% completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. Table A Building Number WING-I Sr. Tasks /Activity Percentage No of work done 1 Excavation 100% 2 Basements Nil 3 Podiums (if any) Nil 4 Plinth 100% 5 Stilt Floor 100% 6 Slabs of Super Structure 100% 7 Internal walls, Internal Plaster, Floorings, Doors and 100% Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises 100% 9 Staircases, Lifts Wells and Lobbies at each Floor level, 100% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 100% completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. Table A Building Number WING-J Sr. Tasks /Activity Percentage No of work done 1 Excavation 100% 2 Basements Nil 3 Podiums (if any) Nil 4 Plinth 100% 5 Stilt Floor 100% 6 Slabs of Super Structure 100% 7 Internal walls, Internal Plaster, Floorings, Doors and 100% Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises 100% 9 Staircases, Lifts Wells and Lobbies at each Floor level, 100% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 100% completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. Table A Building Number WING-E Sr. Tasks /Activity Percentage No of work done 1 Excavation 100% 2 Basements Nil 3 Podiums (if any) Nil 4 Plinth 100% 5 Stilt Floor 100% 6 Slabs of Super Structure 100% 7 Internal walls, Internal Plaster, Floorings, Doors and 100% Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises 100% 9 Staircases, Lifts Wells and Lobbies at each Floor level, 100% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 100% completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. Table A Building Number WING-A Sr. Tasks /Activity Percentage No of work done 1 Excavation 100% 2 Basements Nil 3 Podiums (if any) Nil 4 Plinth 100% 5 Stilt Floor 100% 6 Slabs of Super Structure 100% 7 Internal walls, Internal Plaster, Floorings, Doors and 78% Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises 21% 9 Staircases, Lifts Wells and Lobbies at each Floor level, 74% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 69% completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and 21% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. Table A Building Number WING-B Sr. Tasks /Activity Percentage No of work done 1 Excavation 0% 2 Basements Nil 3 Podiums (if any) Nil 4 Plinth 0% 5 Stilt Floor 0% 6 Slabs of Super Structure 0% 7 Internal walls, Internal Plaster, Floorings, Doors and 0% Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases, Lifts Wells and Lobbies at each Floor level, 0% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. Table A Building Number WING-C Sr. Tasks /Activity Percentage No of work done 1 Excavation 0% 2 Basements Nil 3 Podiums (if any) Nil 4 Plinth 0% 5 Stilt Floor 0% 6 Slabs of Super Structure 0% 7 Internal walls, Internal Plaster, Floorings, Doors and 0% Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases, Lifts Wells and Lobbies at each Floor level, 0% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. Table A Building Number WING-D Sr. Tasks /Activity Percentage No of work done 1 Excavation 0% 2 Basements Nil 3 Podiums (if any) Nil 4 Plinth 0% 5 Stilt Floor 0% 6 Slabs of Super Structure 0% 7 Internal walls, Internal Plaster, Floorings, Doors and 0% Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases, Lifts Wells and Lobbies at each Floor level, 0% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. Table A Building Number WING-F Sr. Tasks /Activity Percentage No of work done 1 Excavation 0% 2 Basements Nil 3 Podiums (if any) Nil 4 Plinth 0% 5 Stilt Floor 0% 6 Slabs of Super Structure 0% 7 Internal walls, Internal Plaster, Floorings, Doors and 0% Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases, Lifts Wells and Lobbies at each Floor level, 0% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. TABLE-B Common Areas (Internal & External Development Works) in Respect of the entire Registered Phase / Project Number S.No. Common areas and Proposed Percentage of Details Facilities, Amenities (Yes/No) Actual Work done (As on date of the certificate) 1 Internal Roads & Footpaths Yes 98% As Per Sanctioned Plan 2. Water Supply Yes 100% MIDC Water Supply 3. Sewerage (chamber, lines, Yes 99% As Per Sanctioned Plan Septic Tank , STP) 4. Storm Water Drains No 0 NA 5. Landscaping & Tree Yes 98% As Per Sanctioned Plan Planting 6. Street Lighting No 100% As Per Sanctioned Plan 7. Community Buildings No 73% As Per Sanctioned Plan 8. Treatment and disposal of No 0 NA sewage and sullage water 9. Solid Waste management & No 0 NA Disposal 10. Water conservation/ Rain No 0 NA water harvesting 11. Energy management No 0 NA 12. Fire protection and fire No 0 NA safety Requirement 13. Electrical meter room, sub- Yes 51% Meter Pannel station, receiving station shall be provided 14. Open Parking No 0 NA Yours Faithfully Mr. Manish Radheshyam Khobragade Name of Architect & Signature Agreed and Accepted by: Pankaj Chandrakant Ghoradkar Authorized Signatory Imperial Gruh Nirman Sahakari Sanstha Date:- 06/04/2026