Ajay Haripal Thawre Planning & Design Engineor / Site Engineer Mob. No.9423110591 Plot No. 67, Sant Kabir Nagar, Nari Road, Uppalwadi, Nagpur - 440026 FORM.2 [see Regulation 3l ENGINEERIS CERTIFICATE Date: LL I LO /2OL9 To, IMPERI.AL GRUH NIRMAN SAHAKARI SANSTHA RH-20, BUTIBORI INDUSTRIAL AREA, BUTIBORI, NAGPUR-44 1 108 SubJect: Certificate of Cost Incurred' for Development of of IMPERIAL HEIGHTS having MahaRERA Regsitration number P5O5OOOL2942 being developed by trPERIAL GRIIH NIRMAN SAIIAIIARI SANSTHA NAGPUR. Sir, I/We AJay Hartpal Thawre have undertaken assignment of certifying Estimated Cost for IMPERIAL HEIGHTS having MahaRERA Registration number P5O5OOO12942 being developed by IMPERIAL GRUH NIRMAN SAHAKARI SANSTHA NAGPITR. We have estimated the cost of Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the Drawings/plans mSde available to us for the project under reference by the Developer/Consultants. The Schedule of items and quantity for the entire work as calculated by AJay Harlpal Thawre (quantity Surveyor) appointed by Developer/Engineer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain/confrrm the above analysis glven to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference as Rs.3ti.12,95.305 / -(Total of Table A alld B) at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certilicate / completion certificate for the Buildings / Wing(s) / L^ayout Plotted Development from the NIT Nagpur being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs.9.71,56.1 lO / -(Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the basis of input materials / services used and unit cost of these items. 5. ltre Balance cost of Completion of the Civil, MEP and Allied works for the completion of the apartments aIrd proportionate completion of internal & external works, as per specifications mentioned in agreement of sale, of the Project is estimated at Rs.28,41,39,195/- (Total of Table A and B). 6. I certi$ that the Cost of t}re Civil, MEP and Allied work for the apartments and proportionate completion of intemal & external works, as per specifications mentioned in agreement of sa1e, of the. aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLE A Sr. No.' Particulars Amount lln Rs.l I Total Estimated cost of the Building / Wing / Layout 36,89,t6,t20 /- / Plotted Development as on date of Registration is 2. Cost incurred as on date of certificate 9,59,18,191/- 3 Work done in Percentage 26o/o (as Percentage of the estimated cost ) 4 Balance Cost-to be Incurred 27,29,97,9291- (Based on estimated Cost) 5 Cost Incurred on Additional / Extra Items not included Nil/- in the estimated Cost (Table C) TABLE B Internal & E