FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Data As of Date: 01/04/2020 Date: 29/09/2023 To, Mauli Infrastructure Subject: Certificate of Percentage of Completion of Construction Work of Mauli Nagar having MahaRERA Registration Number P50500021271 being developed by Mauli Infrastructure. Sir, I/ We Umesh Lamge have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of Mauli Nagar having MahaRERA Registration Number P50500021271 being developed by Mauli Infrastructure. Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this certificate the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE - A Layout / Building/ Wing Number _____ (to be prepared separately for each Layout / Building / Wing of the Project) Sr Task / Activity Percentage of Actual No. (2) Work Done (As on (1) date of the Certificate) (3) 1. Excavation 20% 2. Basements (if any) 0% 3. Podiums (if any) 0% 4. Plinth 0% 5. Stilt Floor 0% 6. Slabs of Super Structure 0% 7. Internal walls, Internal Plaster, Floorings, Doors and Windows 0% within Flats/Premises 8. Sanitary Fittings within the Flat/Premises 0% 9. Staircases, Lifts Wells and Lobbies at each Floor level, Overhead 0% and Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of 0% terraces with waterproofing of the Building/Wing. 11. Installation of lifts, water pumps, Fire Fighting Fittings And 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building / Wing, Compound Wall and all other requirements as maybe required to complete project as per specifications in agreement of Sale. Any other activities. Table B Common Areas (Internal and External Development Works) in respect to the Registered Phase / Project Number Sr. Common areas Proposed Percentage of Details No and Facilities. (Yes/No) Work done (5) (1) (2) (3) (As on date of the Certificate) (4) 1. Internal Roads& Yes 20% As Per Norms Footpaths 2. Water Supply Yes 20% As Per Norms 3. Sewerage (chamber, lines, Yes 20% As Per Norms Septic Tank, STP) 4. Storm Water Drains Yes 20% As Per Norms 5. Landscaping & Tree Planting Yes 20% As Per Norms 6. Street Lighting Yes 20% As Per Norms 7. Community Buildings No NA NA 8. Treatment and disposal of Yes 20% As Per Norms sewage and sullage water 9. Solid Waste management & Yes 20% As Per Norms Disposal 10. Water conservation, Rain water Yes 20% As Per Norms harvesting 11. Energy management No NA NA 12. Fire protection No NA NA And fire safety requirements 13. Electrical meter room, sub- Yes 20% As Per Norms station, receiving station 14. Others (Option to Add More)