!llll UMESH LAMGE ARCHITECH 6, INTERIOR DESIGNER 402, DAYA CHAMBER, AJNI SQ., WARDHA ROAD, NAGPUR-15 Cell - 09822556554, E-mail - lamgeTl@gmail.com FORM 1 ARCHITECT,S CERTIFICATE Date:23101/2023 To, MAULI INFRASTRUCTURE 105, Prince Castle, Gajanan Nagar, Nagpur - 440015' of MAULI NAGAR having of completion of construction work subject : certificate of Percentage MahaRERARegistrationNumberP5o5ooo2l2TlbeingDevelopedby Mauli lnfrastructure' tll'r."rn percentage of completion of as Architect of certifying M. Lamge have undertaken assignment p50500021271 being having MahaRERA Registration Number construction work of MAULr NAGAR Developed by Mauli lnfrastructure' BasedontheSitelnspection,withrespecttotheLayout/eachBuilding/WingoftheaforesaidReal EstateProject,lcertifythatasondateofthisCertificate,thePercentageofWorkDoneforeachofthe herein below' The under MahaRERA is as per Table-A Building/wing of the Real Estate Project phase is detaired in Table-B' percentage of work executed with respect to each of the activity of entire TABLE-A layout/Building/Wing Number (to be prepared separatety for each Layout/Buitding/Wing of Project) - S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 2 Basements (if any) 3 Podiums (if any) 4 Plinth 5 Stilt Floor 6. Slab of Super Structure 7 lnternal Walls, lnternal Plaster, Floorings, Doors, windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 9 Staircases, Lift Wells & Lobbies at each Floor Level Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of Terraces, with waterproofing of the Building / Wing 7t. lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth protection, paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (lnternal & External Development Works) in respect of the Registered Phase / Project Number S. No. Common Areas & Facilities Proposed Percentage of actual Work Done Details (Yes / No) (As on date of Certificate) (1) (2) (3) (4) (s) 1. lnternal Roads & Footpaths Yes 1,00% 2. Water Supply Yes 1,00% 3. Sewerage (Chamber, Lines, Septic Yes 10Oo/o Tank, STP) 4. Strom Water Drains Yes 100% 5. Landscaping & Tree Planting Yes 100% 6. Street Lighting Yes 100% 7 Community Buildings No o.o% 8. Treatment & Disposal of Sewage and Yes 100% Sullage Water 9. Solid Waste Management & Disposal Yes 100% 10. Water Conservation / Rain Water Yes 100% Harvesting 11 Energy Management No 0.0% L2 Fire Protection & Fire Safety No 0.0% requirements 13 Electric Sub-Station Yes 100% 1.4. Open Space Yes 100% Agreed & Accepted by: Yours faithfully, MAULI INFRASTRUCI'URE Date:23101,12023