J EI,IUTil orchitects & interior DESIGN CONSUI.TANCY & CONIRACI EXECUIION DATE:3G06-2022 ARCHITECT'S CERT!FICATE For Quarter Ending 30TH June 2022 (QTR. 1ST F.Y 2022-2023) To, Luxora lnfrastructures P\rt. Ltd. Unit No 150, Avior Corporate Park, Nirmal Galary, L.B.S. Road, Mulund (West), Mumbai - 400080 Subject: Certificate of Percentage of Completion of Construction Work of SpRINGFIELD{3 of the Proiect Ensaara Metropark' Which is Third phase" having MahaRERA Registration Number P5050O018570 being developed by Luxora lnfrastructure pvt Ltd. Sir, I/ we sruDlo ELEVEN have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Development work of SPRTNGFIELD-O3 @totting Project) of the Project Ensaara Meftopark' Which is Third phase,, having MahaRERA Registration Number. P50500018570 being developed by Luxora Infrastructure pvt. Ltd. Based on Site Inspection, with respect to Layout / each of the Building /wing of the aforesaid Real Estate Project. I Certiff that as on the date of this certificate, the Percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table plot no 61, shordo Nogor, hudkeshwor police slotion rood, neor vithobo lown, Nogpur 44m34, www.sludioeleven.in orchitects & inlerior .T tEUE ltl T DESIGN CONSUI.TANCY E CONTRACI EXECUTION INTERNAL & EXTERNAL DEVELOPMENT IN RESPECT OF ENTIRE RE GISTERED BUILDINGS: PERCENTAGE COMPTETION A5 ON MAR.2O22 Sr.No. Description %age of Work Done 7 lnternal Road & footpath 62.84% 2 Water Supply 23.84% 3 Sewerage (Sewer lines and Chambers) 93.720/" 4 Strom Water Drain 84.47% 5 Land Scape & Tree Planting 86.79Yo 6 Street Light 0.00% 7 Community Building (lncluding lnterior Work) o.oo% 6 Treatment and disposal of sewage and sullage water o.oov 9 Solid waste management and disposal N.A. 10 Water conservation, rain water harvesting 0.00 11 Energy management N.A. 72 Fire protection and fire safety requirements N.A. 13 Electrical meter room, substation, receiving station 4t.83% Your's Sincerely, FoT STUDIO ELEVEN a ^ r. Sachin I(. Kukade Architect SACHIN K KUKADE cA/2007 /3938s Agreed and Accepted by : For Luxora Infrastructure Pvt Ltd Name : Umesh Patankar Date:30 hne2022 plol no 61, shordo Nogor, hudkeshwor police sto'tion rood, neor vithobo lown, Nogpur 440034, www.studioeleven.in