orchitecls & interior &[;ffi DESIGN CONSUTTANCY & CONTRACI EXECUTION DATE 30-09-2022 ARCHITECT'S CERTIFICATE To, Luxora lnfrastructures Pvt. Ltd' Unit No 150, Avior CorPorate Park, Nirmal GalaxY, L.B.s. Road, Mulund (West), Mumbai- 400080 of Construction Work of SPRINGFIEtD'03 of Subject: certificate of Percentage of Completion having MahaRERA Registration Number the Project Ensaara Metiopark' Which is Third Phase" P5O5OOO1857O being developed by Luxora lnfrastructure Pvt Ltd' Sir, I/WesTUDloELEVENhaveundertakenassignmentasArchitect/LicensedSuweyorof ceftiryingPercentageofCompletionofDevelopmentWorkofSPRINGFIELD-03@lotting Project) of the Project Ensaara Metropark' Which is Third Phase" having MahaRERA RegistrationNumber.P5050001S5T0beingdevelopedbyLuxoraInfrastructurePl.t.Ltd. Based on site Inspection, with respect to Layout / each of the Building AVing of the aforesaidRealEstatePloject.ICertirythatasonthedateofthiscertificate,thePercentageof WorkdoneforeachofthebuildingAVingoftheRealEstateProjectunderMahaRERAisas executed with respect to each of the per Table A herein below. The percentage of the work activity ofthe entire phase is detailed in Table plotno6l,shordoNogo',hudkeshworpoliceslotionrood,neorVilhobolown,Nogpur440034,www.studioeleven.in J E LTUI tI orchitects & interior DESIGN CONSUTTANCY & CONTRACT EXECUTION REGISTERED BUI IDINGS: INTERNAL & E)fiERNAL D LOPMENT IN ECT OF ENTI PERCENTAGE COMPLEIION AS ON SEPT.2O22 Sr.No. Description %age of Work Done 1 lnternal Road & footpath 62.84/o 7 Water Supply 63.23% 3 SeweraBe (Sewer lines and Chambers) 93.72% 4 Strom Water Drain 95.24% 5 Land Scape & Tree Planting 86.79% 6 Street Light o.oo% 7 Community Building (lncluding lnterior Work) o.oo% 8 Treatment and disposal of sewage and sullage water 0.00% 9 Solid waste management and disposal N.A. 10 water conservation, rain water harvestinS 0.00 11 Energy management N.A t2 Fire protection and fire safety requirements N.A. 13 Electrical meter room, substation, receiving station 47.83% Your's Sincerely, For STUDIO ELEVEN n' s""nin*[of,l[ft3"9, Architect SACIIIN K KUKADE cA/2007/393S5 cA/2O0713938s NIT-2307 NMc/Ii'"83 Agreed and Accepted by : For Luxora Infrastructure Plt Ltd Name : Umesh Patankar Date : 30 Sept2022 plot no 61, shordo Nqgor, hudkeshwor police slolion rood, neor vilhobo lown, Nogpur 440034, www.sludioeleven.in