,) orchitects & inlerior DESIGN CONSUITANCY ! CONTRACT EXECUTION * ELTUT!I DATE: 3l-03-2022 ARCHITECT'S CERT]FICATE To, Luxora lnfrastructures Pvt. Ltd. Unit No 150, Avior Corporate Park, Nirmal Galaxy, L.B.S. Road, Mulund (Westl, Mumbai - 400080 Subject: Certificate of Percentage of Completion of Construction Work of SPRINGFIETD-03 of the Prorect Ensaara Metropark' Which is Third Phase" having MahaRERA Registration Number P50500018570 being developed by Luxora lnfrastructure Pvt Ltd. Sir, I/ We STUDIO ELEVEN have undertaken assignment as Architect /Licensed Surveyor of certifring Percentage of Completion of Development Work of SPRINGFIELD-O3 (Plotting Project) of the Project Ensaara Metropark' Which is Third Phase" having MahaRERA Registration Number. P50500018570 being developed by Luxora Infrastructure Pvr. Ltd. Based on Site Inspection, with respect to Layout / each of the Building /Wing of the aforesaid Real Estate Project. I Certi! that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table plol no 61, shordo Nogor, hudkeshwor police stolion rood, neor vithobo lown, Nogpur 440034, www.studioeleven.in d ETIUEH orchilects & inlerior DESIGN CONSUI.TANCY & CONTRACI EXECUTION INTERNAL & EXTERNAL DEVELOPMENT IN RESPECT OF ENTIRE REGISTERED BUIIDINGS : PERCENTAGE COMPLETION AS ON M482Q22 Sr.No. Description %age of Work Done t lnternal Road & footpath 58.45% 2 Water Supply 23.84% 3 Sewerage (Sewer lines and Chambers) 93.45% 4 Strom Water Drain 84.47% 5 Land Scape & Tree Planting 86.79% 6 Street Light 0.00% 7 Community Building (lncluding lnterior Work) o.00% 8 Treatment and disposal of sewage and sullage water o.o0/o Solid waste management and disposal N.A. 9 10 Water conservation, rain water harvesting 0.00 11 Energy management N.A. 72 Fire protection and fire safety requirements N.A. 13 Electrical meter room, substation, receiving station 41.83% Your's Sincerely, For STLIDIO ELEVEN Ar. Sachin K. Kuka;:e Architect SACHIN K KUKADE :.,3d. Arch tscl cA/2O07 13938s cAt2007t3i3;5 NrT-2307 Agreed Accepted by : NMC/R-483 ll,AGPUR For Luxora Infrastruc Ltd Name : Umesh Date : 31 Mar 2022 plol no 61, shordo Nogor, hudkeshwor police stqtion rood, neor vilhobo lown, Nogpur 440034, www.studioeleven.in