r - Er. Dhawal Harshe B.E. & D.c.e. (civit) ,s. \)\ 9158Essoos 8 dhawal. harshe @gmail.com \ DIVINE PROJECT5 Architects. Engineers. Contractorg. Anne:nrre A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATT (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date:30-09-2024 To, Sacchidanand Realities Private Limited, Flat No. 1O3,LO4, Sanchayni Complex, Near NIT Garden, Trimurti Nagar, Nagpur- 44OO22. Subject: Certificate of Percentage of Completion of Construction Work of "Waman Nagari,, having MahaRERA Registration Number P50500018405 situated on land bearing KH. No.159/1, P.H.No.38, Mouza- Pipla,Taluka-Nagpur (Gramin), District Nagpur, being Developed by Sacchidanand Realities private timited. Sir, I Dhawal harshe have undertaken assignment as Architect / Licensed Surveyor of certifying Percentage of completion of construction work of "waman Nagari" having MahaRERA Registration Number P50500018406 being Developed by Sacchidanand Realities Private Limited. Based on the Site lnspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of .the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. I, side of Chintamani bar, Manewada TABLE.A Layout / Building / Wing Number "Waman ilagari" (to be prepared separately for each LayouUBuilding/VVing of Project) s. Tasks / Activity Pelcentage Percentage Percentage Percentage No. of Actual of Actual of Actual of Actual Work Work Work Work Done Done Done Done (As on (As on (As on (As on date ofthe date ofthe date ofthe date ofthe Certificate) Certificate! Certificatel Certificatel (1) (2) Tower -A Tower -B Tower -C Tower -D 7. Excavation tooo/o LOO% 700% 700% 2_ Basements (if any) LOO% LOO% looo/a t0o/" 3. Podiums (if any) too% LOOo/o LOO% o% 4. Plinth 5. Stilt Floor 6. Slab of Super Structure TOOo/" 700% 100% 0o/o 7. lnternal Walls, lnternal Plaster, 100% 100% LO0o/o 0% Floorings, Doors, windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 700% 700% 100% o% 9. Staircases, Lift Wells & Lobbies at each 100% 100% too% o% Floor Level Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, TOOo/o 100% 100% 0% Elevation, Completion of Terraces, with waterproofing of the Building / wing 11. lnstallation of Lifts, Water Pumps, Fire LOO% LOO% roo% Oo/o Fighting Fittings and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to. Agreement of Sale, Any other Activity TABLE-B Common Areas (lnternal & External Development Works) in respect of the Registered phase / project Number S. No. Common Areas & Facilities Proposed Percentage of Details (Yes/ No) actual Work Done (As on date of Certificatel (1) l2t (3) (4) (s) 1. lnternal Roads & Footpaths YES 90% As Per Sanction 2. Water Supply YES 70% As Per Sanction 3. Sewerage (Chamber, Lines, Septic YES 70% As Per Sanction Tank, STP) 4. Strom Water Drains YES 650/o As Per Sanction 5. Landscaping & Tree Planting YES 60% As Per Sanction 6. Street Lighting YES so% As Per Sanction 7. Community Buildings YES 55o/" As Per Sanction 8. Treatment & Disposal of Sewage and YES 55o/o As Per Sanction Sullage Water 9. IglilltEltsl4eleEersrlg9i:pe:t YES 6s% As Per Sanction 10. Water Conservation / Rain Water YES 650/o As Per Sanction Harvesting 11. Energy Management YES 60% As Per Sanction 12. Fire Protection & Fire Safety YES 65% As Per Sanction requirements 13. Electrical Meter Room, Sub-Station, YES 600/o As Per Sanction Receiving Sfifia.- L4. others 1ffip6QQqd\prel YES 55o/o As Per Sanction Yours faithfully, I ieanca Fnainaa Engineer/ (State License No- STATE/R/2O2?| ApVOfltSgl ry S. HARSHE (N.M.R.D.A. License No- 441) o (N.l.T. License No- 3fiD) Agreed & Accepted by: Signature of Plomoter Name: Sacchidanand Realities Private Limited Partner: Pankai Thakre Date:30-09-2024