I Ar. AITIJALI KADAM Architect ,*k*xg.gxg=k (e860es061 1) Flat No G-6, Cheenab Apt., Near AjniSq., Prashant Nagar, Nagpur. Mall:wavearchT@Smail.com I web:www.wavearch.com Date. : I I Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date:30-09-2023 To, Sacchidanand Realities Private Limited, Flat No. 103,104, Sanchayni Complex,Near NIT Garden, Trimurti Nagar, Nagpur- 440022. Subject:Certificate of Percentage of Completion of Construction Work of"Waman Nagari"having MahaRERA Registration Number P50500018406 (Only applicable after Project Registration) being Developed by Sacchidanand Realities Private Limited. Sir, I Anjali Kadam have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of "Waman Nagari"having MahaRERA Registration Number P50500018406 (Only applicable after Project Registration) being Developed by Sacchidanand Realities Private Limited. ' Based on the Site lnspection, with respect to the Layout / each BuildingA//ing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildingMing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE.A Layout / Building / Wing Number "Waman Nagari"(to be prepared separately for each Layout/BuildingA//ing of Project) S. Tasks / Activity Percentage Percentage Percentage No. of Actual of Actua! of Actua! Work Done Work Done Work Done (As on (As on (As on date of the date of the date of the Gertificate) Certificate) Certificate) (1) (21 Tower -A Tower -B Tower -C 1. Excavation 100o/o 100% 100% 2. Basements (if any) 100% 100% 100% 3. Podiums (if any) 100o/o 100o/o 100o/o 4. Plinth 5. Stilt Floor 6. Slab of Super Structure 100% 100% 100% 7. lnternal Walls, lnternal Plaster, Floorings, 100o/o 90o/o 100o/o Doors, windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 100o/o 95o/o 100o/o 9. Staircases, Lift Wells & Lobbies at each 100o/o 95% 100o/o Floor Level Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, 100o/o 90% 100o/o Elevation, Completion of Terraces, with waterproofing of the Buildinq / Wino 11. lnstallation of Lifts, Water Pumps, Fire 100o/o 90o/o 100o/o Fighting Fittings and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of I Environment CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingA//ing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (lnternal & External Development Works) in respect of the Registered Phase / Project Number S. Common Areas & Facilities Proposed Percentage of Details No. (Yes / NO) actualWork Done (As on date of (1) (21 (3) (4) 5 1. lnternal Roads & F YES 70o/o As Per Sanction 2. Water Supplv YES 60o/o As Per Sanction 3. Sewerage (Chamber, Lines, YES 55% As Per Sanction ic Tank, STP 4. Strom Water Drains YES 55% As Per Sanction 5. & Tree Planti YES 55% As Per Sanction 6. Street Liohtino YES 50% As Per Sanction 7. Communitv Buildinos YES 55o/o As Per Sanction 8. Treatment & Disposal of Sewage YES 55o/o As Per Sanction 9. Solid Waste Management & YES 65% As Per Sanction 10. Water Conservation / Rain Water YES 65o/o As Per Sanction 11. Enerov Manaoement YES 55% As Per 12. Fire Protection & Fire Safety YES 65o/o As Per Sanction 13. Electrical Meter Room, Sub- YES 600/o As Per Station. Receivinq Station 14. Others (Ootion toAdd more) YES 55o/o As Per Yours faithfully, Signature & Anjali Kadam (rN BLOCK / Architect License Number. Agreed & Accepted by: ffim Signature of Promoter Name:Sacchidanand G/ry vate Limited Partner: Pankaj Thakre Date:30-09-2023