FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE Date: 05/07/2021 To, SADESH REALTY BUILDERS LLP, House No. 897, Shivnarayan Bhawan, P S Agrawal Marg, Santra Market, Near Hanuman Temple, Nagpur-440018(MH) Subject: Certificate of Percentage of Completion of Construction Work of DIVINE CITY having MahaRERA Registration no. P50500019810 being developed by Sadesh Realty Builders LLP. Sir, I/We Architect Kalyani Adhau have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of DIVINE CITY, having MahaRERA Registration no. P50500019810 being developed by Sadesh Realty Builders LLP. Based on Site Inspection, with respect to the building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A DIVINE CITY Sr. Tasks /Activity Percentage No of work done 1 Excavation NA 2 Basements (if any) NA 3 Podiums (if any) NA 4 Plinth NA 5 Stilt Floor NA 6 Slabs of Super Structure NA 7 Internal walls, Internal Plaster, Floorings, Doors and NA Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises NA 9 Staircases, Lifts Wells and Lobbies at each Floor level, NA Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, NA completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and NA Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. TABLE-B Common Areas (Internal & External Development Works) in Respect of the entire Registered Phase / Project Number S.No. Common areas and Propos Percentage Details Facilities, Amenities ed of (Yes/N Actual Work o) done (As on date of the certificate) 1 Internal Roads & Footpaths Yes 10% As Per Plan 2. Water Supply Yes 12% As Per Plan 3. Sewerage (chamber, lines, Yes 18% As per Plan Septic Tank, STP) 4. Storm Water Drains Yes 15% As Per Plan 5. Landscaping & Tree Planting Yes 0% As Per Plan 6. Street Lighting Yes 0% As Per Plan 7. Community Buildings No 0 NA 8. Treatment and disposal of Yes 0% As Per Plan sewage and sullage water 9. Solid Waste management & No 0 NA Disposal 10. Water conservation/ Rain Yes 15% As Per Plan water harvesting 11. Energy management No 0 NA 12. Fire protection and fire safety No 0 NA Requirement 13. Electrical meter room, sub- No 0 NA station, receiving station Yours Faithfully Architect Kalyani Adhau Name of Architect & Signature Agreed and Accepted by: Signature of Promoter Dilip Pralhadrai Agrawal Partner/Authorised Signatory Date: 05/07/2021