mqnole DESIGN FORM 1 Architeclure [See Regulation 3] Planning & ARCHITECT'S CERTIFICATE lnteriors Date: 15 /Ol / 2022 To, The Kukreja Infrastructures 17, Kukreja House, Sugat Nagar, Jaripatka Ring Road Nagpur-44OO 14 Subject: Certificate of Percentage of Completion of Construction Work of KUKREJA INFINITY having MahaRERA Registration no. p50500015438 being developed by KukreJa lrfrastructures. Sir, tl We Emanatc Deslen hltect Lokesh Kadul have undertaken assignment as Architect /Licensed Surveyor of certifying percentage of Completion of Construction Work of KUKREJA INFINITY, having MahaRERA Registration no. P50500015438 being developed by KukreJa Infrastructures. Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project , I certify that as on the date of this certihcate, the percentage of Work done for the building of the Real Estate project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. &X Block No. 11, l1A, 12, 3rd Floor, A'Wing (J.8 Wing), l'langalwari Compler, Sadar, Nagpur - 440001 I S82J872384, i2?6384238 emanatedesigng@gmail.com I wuw.emanatedesiqn.in Table A Building Number KUKREJA INFINITY Sr. Tasks /Actlvity Percentage No of work done 1 Excavation l OOo/o 2 Basements (if any) LOO/" 3 Podiums (if any) o 4 Plinth tooo/" 5 Stilt Floor 95o/o 6 Slabs of Super Structure '. 29 Floor (Including Stilt/ Ground 97Y" Slab ) 7 Intemal walls, Internal Plaster, Floorings, Doors and 5O"/" Windows within Flat/ Premises 8 Sanitary Fittings within the Flat/Premises 2O/" 9 S taircases, Lifts Wells and Lobbies at each Floor level, 45o/o Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 3O"/" completion of terraces with waterprooflng of the Building/Wing 11 Installati on of 1ifts, water pumps, Fire Fighting Fittings and 3O/o Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of enyironmenf /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. \r KESH KADL cAl 20o7l 39381 4t^ \rMa Q .402 NIr-21 TABLE-B Common Areas (Internal & E:rteraal Developmeat Works) in Respect of the entire Registered Phase / Project Number S.No. Common areas and Proposed Percetrtage of Details Facllities, Arnealties (Yes/Nol Actual trIork done (As on date of the certificatef I Internal Roads & No o NA Footpaths 2 Water Supply Yes 40% As Per Sanction Plan 3 Sewerage (chamber, lines, Yes 45%o As Per Sanction Septic Tank , STP) Plan 4 Storm Water Drains Yes 4sYo As Per Salction Plan 5 Landscaping & Tree Yes o As Per Sanction Planting Plan 6 Street Lighting No 0 As Per Sanction Plan 7 Community Buildings No o NA 8 Treatment and disposal of No o NA sewage and sullage water 9 Solid Waste management No 0 NA & Disposal 10. Water conservation/ Rain Yes 0 As Per Sanction water harvesting Plan 11. Ener$r management No 0 NA t2. Fire protection and fire Yes 2OYo As Per Sanction safety Plan Requirement 13. Electrical meter room, Yes OYo As Per Sanction sub-station, receiving Plan station /f ESH KADL \TL 2 oo7/ c 39381 4(' \lM. R.4 02 NIr-z1 LOKESH KADI; cAl2007l3938r \rM. 402 NIT' 2 1 4c' R. _ Emanate Desiga (Archltect Lokesh Kadu) Name of Architect & Signature Agreed and Accepted by: r Kukreja Inftastructures Datez- 15lOLl2022