ll Shree Swami Samarth ll Raiesh M. Bisney Radhika Conctruction, Matoshree Gomplext Tu msar D ist-Bhan dara'441 91 2 D.C.E. B.ARGH. ?i.9422822151 ARGH ITEGT/GOV. REG D.VALU ER Emai l-rajeshbisne@gmail.com REGD WITH COA-CA/201 8/{ 04390 CHARTERED ENGINEER .M.{669502 Annexure-B FORM-2 ENGINEER'S CERTIFICATE {To be submitted at Q-Oct to Dec 2021- the time of Registration of Ongoing Project and for s'ithdrawal of Money from Designated Account - Project wise) Date: 1Bl01,12022 To SmL RATNABAI MOHADIKAR PLOT NO 77 PANCHWATI NAGAR AMBEDKAR MARG NAGPUR-4 4OOI7 Subject: Certificate of cast incurred for Development of "SHUBHLAXMI CELEBRATION HALL" at Crs/Sur/Kh. pLOT NO 551 Mouza: Nagpur (M Corp.) Tah: Nagpur(Urban) Dist: Nagpur-44001'7 having MahaRERA Registration No.P50500016933 being developed by Smt. RATNABAI MOHADIKAR Sir, 1. I/ We have undertaken assignment of certifying {stimated Cost for "SHUBHLAXMI CELEBRATION HALL" at Cts/Sur/Kh. PLOT N0 551 Mouza: Nagpur [M Corp.) Tah: Nagpur[Urban) Dist: Nagpur- 44OO1,T having MahaRERA Registration No. P50500016933 being developed by Smt. RATNABAI MOHADIKAR Z.We have estimated the cost of Civil, MEP and allied works required of completion of the apartment and proportionate completion of internal & external works of the project as per specifications mentionld in agreementof sale. Our estimated cost calculation is based on the drawings/plans made items available to us for the project under reference by the Developer/ Consultants. The Schedule of and quantity required for the entire work as calculated by Rajesh Bisney Quantity Surveyorx appointed by Developer/Engineer. The assumption of the cost of material labor and other inputs ..a" by developer and the"site inspection carried out by us to ascertain / conform the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference at proiect Rs.64523020[Total of Table A and BJ at the time of Registration. The estimated Total cost of is with reference to the Civil, MUP and Allied works required for completion of the apartments and proportionate completion of internal & external works. as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate/completion certificate for the buildings/Wings/ Layout/plotted Development from the NMC Nagpur being the Planning Authoriry under whose jurisdiction the aforesaid project is being implemented. 4. The Estimate Cost incurred till date is calculated at Rs. 38952236 (Total of table A and BJ the and amount of Estimated Cost incurred is calculated on the basis of input material /services used unit cost of these items. S. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartment and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale, of the Project is estimated at Rs. 25570784 (Total of Table A and BJ t 6. I certify that the Cost of the Civil, MEP and allied work for the apartments and proportiona:= internal & external works, as per specifications mentioned in agreement of sale, of the aforesa.: Project as compelled on the date of this certificate is as given in 'table A and B below TABLE -A Building/wing/Layout/Plotted Development bearing Number....or called_(to be preparec separately for each building /Wing / layout /Plotted Development of the real estate project Sr. No Particulars Amount [in Rs.) 1 Total Estimated Cost of the Building/Wing / Layout /plotted 64523020 Developmen! as on date of Registration is 2 Cost incurred as on date of certificate 38952236 3 Work done in Parentage (as Parentage of the estimate cost) 60.36 4 Balance Cost to be incurred (based on Estimated Cost) 25570784 5 Cost Incurred on additional/Extra items not included in the 0 Estimated Cost [Table -CJ TABLE. B Internal & External Development Works in Respect of the Registered phase Sr. No Particulars Amount [in Rs.) L Total Estirpated Cost of the Building/Wing / Layout /plotted 0 Development as on date of Registration is 2 Cost incurred as on date of certificate 0 3 Work done in Parentage (as Parentage of tlle estimate cost) 0 4 Balance Cost to be incurred (based on Estimated Cost) 0 5 Cost Incurred on additional/Extra items not included in the 0 Estimated Cost [Table -C) Yours hlthfqJ.ly. ARCFl-'TECT RAJESH M, t.i,SNEY B.Arch cA/201 8/ 1 04390 TUMSAR Mob.942 2g2Z151 Stamp & Signature of Engineer Agreed and accepted by Wrh2-- Smt. RATNABAI MOHADIKAR Date: 1Bl07/2022