ll Shree Swami Samarth ll Raiesh M. Bisney Radhika Gonctruction, Matoshree Gomplext Tumsar Dist-Bhan dara'441912 D.C.E. B.ARGH. M.%22A22151 ARCH ITECT/G OV. REG D.VALU E R E ma i l -rai es hbi s ne@g ma i !. co m REGD WITH COA-CA/2o'! 8 1 04390 CHARTERED ENGINEER .M.1 6695O2 Annexure A Form L ARCH ITECT'S CERTIFICATE (To be submitted at Q-APr to fun 2OZ1- the time of Registration of Ongoing Project and for withdrarval of Money from Designated Account) Date: 16107 /2021 To, SmL RATNABAI MOHADIKAR PLOT NO 77 PANCHWATI NAGAR AIU BEDKAR MARG NAGPUR.4 4OOL7 Subject: Certificate of Percentage of Completion of Construction Work of "SHUBHLAXMI CELEBRA'IION HALL" at Cts/Sur/Kh. PLOT NO 551 Mouza: Nagpur [M Corp.) Tah: Nagpur(Urban) Dist: Nagpur-44001'7 having N{ahaRERA Registration No. P50500016933 being developed by Smt. RATNABAI MOHADIKAR l/ We have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of iompletion of Construction Work of "SHUBHLAXMI CELEBRATION HALL" at Cts/Sur/Kh. PLOT NO 551 Mouza, Nagpur (M Corp.) Tah: Nagpur(Urban) Dist: Nagpur-440017 having MahaRERA Registration No. P50500016933 being developed by Smt. RATNABAI MOHADIKAR Based on Site Inspection, with respect to Layout/each of the Building/Wing of the aforesaid Real Estate project. I certify ihut ,r on the date of this certificate, the Percentage of Work done for each of the buiiding/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Layour/buirding/wing Number ,,r,, ,,[TuJ.t;:ITIJT'j':[il ror each Layout /Building /wing or the Proi ect Percentage of Tasks / Activity Actual Work Done (as on date of the Certificate Excavation 100 Basements if an 100 Podiums fif an 100 Plinth 100 Stilt Floor' 100 Slabs of Super Structure 100 internal walls, Internal Plaster, Floorings, Doors and windows within 90 Flats/Premises Sanitary Fittings within the Flats/Premises 85 Staircases. lifu Wells and Lobbies at each Floor Overhead and underground Water Tanks 110 External plumbing and external plaster, terraces with waterProofi n of the InstallationofLifts.Waterpumps,FireFightingrit@ as per cFO Noc, Electrical fittings, mechanicalequipment, comp-lijnce to conditions of environment/cRZ Noc. Finishing to entrancs lobby/s. plinth protection, paving of areas appurtenant to Building/wing. compound wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. (Table- B) Common areas (lnternal & External Development Works) in Respect of the Registered phase/ project Number Sr. Common areas and Proposed Percentage of Details No Facilities, Amenities (Yes/No) Work done 1 Internal Roads & Footpaths No 2 Water Supply Yes 100 3 Sewerage fChamber, Lines, Septic Tank, STp] Yes BO 4 Storm Water Drains Yes 75 5 Landscaping & Tree Planting Yes 60 6 Street Lighting Yes 60 7 Community Bqildings No B Treatment And Disposal of Sewage and Silage No Water 9 Solid Waste Management and Disposal No 10 Water Conservation, Rain water Harvestins No 11 Energy management No 1.2 Fire Protection and Fire Safety Requirements Yes 75 Electrical Meter Room, Sub-Station, Receiving l yes Station BO L+t _qpg!_I3rEn .--t 5 Aggregate area ofrecreational Yes BO Open Space No aithfull RAJESH M. BISNEY B.Arch cA/2018/104390 TUMSAR ," HEt,? l?,lPlJ' LIJ,,"., Agreed and accepted by ',, fufrrr- Smt. MTNABAI MOHADIKAR Date: L6/07 /2021