\ Annexure A FORIU 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date:07-01-2021 To, Kolbaswami Awirat Construction And Developers House No. 865, Jagnatha Budhwari, Pachpaoli Road, Ku m bharpu ra, Nagpu r-tt4fl)17. Subject: Certificate of Percentage of Completion of Construction Work of "ASHOK VATIKA" having Maha RERA Registration Number P50500013895 (Only applicable after Project Registration) being Developed by Kolbaswami Awirat Construction And Developers. Sir, I ASHFAQUE HUSSAIN have undertaken assignment as Architect of Certifying Percentage of Completion of Construction Work of 'ASHOK VATlKA"having Maha RERA Registration Number P50500013895 (Only applicable after Project Registration) being Developed by Kolbaswami Awirat Construction And Developers. ' Based on the Site lnspection, with respect to the each Building of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for eachof the Building of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE.A Building 'MM[!(A"Wing-A (to be prepared separately for each BuildingM/ing of Project) S. Tasks / Activity Percentage of ActualWork Done No. (As on date of the Certificate) (1) (21 (3) 1. Excavation lOOo/o 2. Basements (if any) NA 3. Podiums (if anv) NA 4. Plinth 100o/o 5. Stilt Floor 85% 6. Slab of Super Structure 50o/o 7. lnternal Walls, lnternal Plaster, Floorings, Doors, 100o/o windows within Flats / Premises L Sanitary Fittinqs within Flats / Premises 1O0o/o 9. Staircases, Lift Wells & Lobbies at each Floor 100o/o Level Overhead and Underqround Water Tanks 10. External Plumbing & External Plaster, Elevation, 100o/o Completion of Terraces, with waterproofing of the Buildinq / Winq 11. lnstallation of Lifts, Water Pumps, Fire Fighting lOOo/o Fittings and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment I CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingM/ing, Compound Wall and all othef requirements as may be required to complete Project as per specifications to Agreement of Sale, Anv other Activitv I TABLE.A Building "A5.@MII(A"Wing-B (to be prepared separately for each BuildingM/ing of Project) S. Tasks / Activity Percentage of Actua! Work Done No. (As on date of the Gertificate) (1) (21 (3) 1. Excavation 1O0o/o 2. Basements (if anv) NA 3. Podiums (if anv) NA 4. Plinth lOOo/o 5. Stilt Floor 85o/o 6. Slab of Super Structure 50o/o 7. lnternal Walls, lnternal Plaster, Floorings, Doors, lOOo/o windows witl.:in Flats I Premises 8. Sanitary Fittings within Flats / Premises 100o/o 9. Staircases, Lift Wells & Lobbies at each Floor lOOo/o Level Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 100o/o Completion of Terraces, with waterproofing of the Buildinq / Wino 11. lnstallation of Lifts, Water Pumps, Fire Fighting 100o/o Fittings and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving ofAreas appurtenant tcf BuildingMing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Anv other Activitv "r., TABLE.B Common Areas (lnternal & External Development Works) in respect of the Registered Phase / Project Number S. Common Areas & Facilities Proposed Percentage Details No. (Yes / of actual No) Work Done (As on date of Gertificate) (1) (21 (3) (4) (5) 1. lnternal Roads & Footpaths No NA NA 2. Water Supply Yes 100o/o As per Sanction 3. Sewerage (Chamber, Lines, Yes 80o/o AS per Sanction Septic Tank, STP) 4. Strom Water Drains No NA NA 5. Landscapinq & Tree Plantinq Yes 0o/o AS per Sanction 6. Street Liqhtins No NA NA 7. Communitv Buildinqs No NA NA L Treatment & Disposal of No NA NA Sewaqe and Sullaqe Water 9. Solid Waste Management & No NA NA Disposal 10. / Water Conservation Rain Yes Oo/o As per sanction Water Harvestinq 11. Energy Management No NA NA 12. Fire Protection & Fire Safety No NA NA requirements 13. Electrical Meter Room, Sub- Yes 100o/o As per.Sanctioned by Station, Receivinq Station MSEB 14. Others (Option to Add more) No NA NA 15 Retainino Wall No NA NA ! /s Agreed & accepted by: ASHFAQUE HUS$AIN 3l =I -\ ffi ,. lP e/i|, 'a{V Signature Of Promoter For.Kolbaswami Awlrat Constructtin u, L'f /-:-->L --Ashok Dhapodkar -Jfi