Annextrre A FORIU 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at thc time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date:31-03-2020 To, Kolbaswami Awirat Construction And Developers House No. 866, Jagnatha Budhwari, Pachpaoli Road, Kumbharpura, Nagpur-44fi)17. Subject: Certificate of Percentage of Completion of Construction Work of "ASHOK VAT;KA" having MahaRERA Registration Number P50500013895 (Only applicable after Project Registration) being Developed by KolbaswamiAwirat Construction And Developers. Sir, I ASHFAQUE HU$iSAlN have undertaken assignment as Architect of Certifying Percentage of Completion of Constructiorr Work of "ASHOK VATlKA"having MahaREM Registration Number pSSSOOO13895(Only applicable after Project Registration) being Developed by Kolbaswami Awirat Construction And Developers. Based on the Site lnspection, with respect to the Building of the aforesaid Real Estate "r"n Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building of thd Real Estate Project under MahaRERA is as per Table-A herein below. The percen[age of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A Building 'SglK VAI1I(A"Wing-A(to be prepared separately for each BuildingMing of Project) S. Tasks / Activity Percentage of Actual Work Done No. (As on date of the Certificate) (1) (2) (3) 1. Excavation 100% 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth 100% 5. Stilt Floor 85o/o 6. Slab of Super Structure 50% 7. lnternal Walls, lnternal Plaster, Floorings, Doors, lOOo/o windows within Flats / Premises 8. Sanitarv Fittinqs within Flats / Premises 100o/o 9. Staircases, Lift Wells & Lobbies at each Floor 100o/o Level Overhead and UndergrounO W4g{Cq[g- 10. External Plumbing & External Plaster, Elevation, 100% Completion of Terraces, with waterproofing of the Buildinq / Winq 11. lnstallation of Lifts, Water Pumps, Fire Fighting lOOo/o Fittings and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment CRZ I NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all othei requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity t i TABLE.A 'ASHOK VATlKA"Wing-B(to be prepared separately for each BuildingMing of S. Tasks / Activity Percentage of ActualWork Done No. (As on date of the Certificate) (1) (21 (3) 1. Excavation lOOo/o 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth 100o/o 5. Stilt Floor 85o/o 6. Slab of Super Structure 5Oo/o 7. lnternal Walls, lnternal Plaster, Floorings, Doors, lOOo/o windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 100o/o 9. Staircases, Lift Wells & Lobbies at each Floor 109o/o Level Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, lOOo/o Completion of Terraces, with waterproofing of the Buildino / Winq 'lnstallation 11. of Lifts, Water Pumps, Fire Fighting 10Oo/o Fittings and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingM/ing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Anv otherActivity u TABLE.B Common Areas (lnternal & External Development Works) in respect of the Registered Phase / Project Number S. Common Areas & Facilities Proposed Percentage Details No. (Yes / of actual NO) Work Done (As on date of Certificate) (1) (2t (3) (41 (5) 1. lnternal Roads & Footpaths No NA NA 2. Water Supply Yes 80% As per Sanction 3. Sewerage (Chamber, Lines, Yes 40o/o AS per Sanction Septic Tank, STP) 4. Strom Water Drains No NA NA 5. Landscaping & Tree Planting Yes 0o/o AS per Sanction 6. Street Liqhtinq No NA NA 7. Community Buildinqs No NA NA L Treatment & Disposal of No NA NA Sewage and Sullaqe Water 9. Solid Waste Management & No NA NA Disposal 10. / Water Conservation Rain Yes 0o/o As per sanction Water Harvesting 11. Enerqy Manaqement No NA NA 12. Fire Protection & Fire Safety No NA NA a reouirements 13. Electrical Meter Room, Sub- Yes 100o/o As per Sanctioned Station, Receiving Station bv MSEB 14. Others (Option to Add more) No NA NA 15 Retaininq Wall No NA NA M Agreed & accepted by: Slgnature Of Promoter ' .- ..--. - =-a License Englneer/ Archlffifime: ForXolbaswaml Awlral Constructlon & Doveloperi ASHFAQUE HUSSAIN (NMc License ro--i.oz 1 Ashok Dhapgr_dJrar (N.I.T. License No- 2265) Xf'^{ (Promoterf Date - 31-03-2020 Kolbaswami Awirat Construction fl And DevelopersDate - 31-03- 2020