Annexrrre A FORIU 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 31-03-2019 To, Kolbaswami Awirat Construction And Developers House No. 855, Jagnatha Budhwari, Pachpaoli Road, Kumbharpura, Nagpur-440017. Subject: Certificate of Percentage of Completion of Construction Work of "ASHOK VATIKA" having MahaRERA Registration Number P50500013895 (Only applicable after Project Registration) being Developed byKolbaswamiAwirat Construction And Developers. Sir, I ASHFAQUE HUSSAIN have undertaken assignment as Architect of Certifying Percentage of Completion of Construction Work of "ASHOK VATlKA"having MahaRERA Registration Number P50500013895(Only applicable after Project Registration) being Developed by Kolbaswami Awirat Construction And Developers. Based on the Site lnspection, with respect to the each Building of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE.A "ASHOK VATII(A"Wing-A(to be prepared separately for each BuildihgM/ing of S. Tasks / Activity Percentage of Actua! Work Done No. (As on date of the Certificate) (1) (21 (3) 1. Excavation 100o/o 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth 10Oo/o 5. Stilt Floor 80% o. Slab of Super Structure 30o/o 7. lnternal Walls, lnternal Plaster, Floorings, Doors, 50% windows within Flats / Premises 8. Sanitarv Fittinos within Flats / Premises 50o/o 9. Staircases, Lift Wells & Lobbies at each Floor 0o/o Level Overhead and Underqround Water Tanks 10. External Plumbing & External Plaster, Elevation, 45o/o Completion of Terraces, with waterproofing of the Buildins / Wing 11. lnstallation of Lif,ts, Water Pumps, Fire Fighting 50o/o Fittings and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment CRZ I NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Gompound Wall and all other requirements as' may be required to complete Project as per specifications to Agreement of Salei Any other Activityt TABLE-A ASHOK VATIKA"Wing-B(to be prepared separately for each BuildingM/ing of Projecl S. Tasks / Activity Percentage of Actual Work Done No. (As on date of the Certificate) (1) (21 (3) 1. Excavation 1Q0o/o 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth 100o/o 5. Stilt Floor 80o/o I 6. Slab of Super Structure 30o/o 7. lnternal Walls, lnternal Plaster, Floorings, Doors, 50o/o windows within Flats / Premises 8. Sanitarv Fittinqs within Flats / Premises 50o/o 9. Staircases, Lift Wells & Lobbies at each Floor Oo/o Level Overhead and Underqround Water Tanks 10. External Plumbing & External Plaster, Elevation, 45o/o Completion of Terraces, with waterproofing of the Building / wi.ng-- 11. lnstallation of Lifts, Water Pumps, Fire Fighting 50o/o Fittings and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale,' Anv other Activity TABLE.B Common Areas (lnternal & External Development Works) in respect of the Registered Phase / Project Number S. Common Areas & Facilities Proposed Percentage Details No. (Yes / of actual No) Work Done (As on date of Gertificate) (1) (21 (3) (4) (5) 1. Internal Roads & Footpaths No NA NA 2. Water Supplv Yes 50o/o As per Sanction 3. Sewerage (Chamber, Lines, Yes 600/o AS per Sanction Septic Tank, STP) 4. Strom Water Drains No NA NA 5. Landscaoinq & Tree Plantino Yes 0o/o AS per Sanction 6. Street Liqhtinq No NA NA 7. Community Buildinqs No NA NA 8. Treatment & Disposal of No NA NA Sewaqe and Sullage Water 9. Solid Waste Management & No NA NA Disposal 10. / Water Conservation Rain Yes SQo/o As per sanction Water Harvestinq 11. Energy Management No NA NA 12. Fire Protection,& Fire Safety No NA NA requirements 13. Electrical Meter Room, Sub- Yes 60% As per Sanctioned Station, Receiving Station bY MSEB 14. Others (Option to Add more) No NA NA 15 Retaininq Wall No NA NA t Agreed & accepted by: Slgnature Of Promoter r---+i .Kolbas,"raml Awlrat Constluctlon & 0ovcicp.:rl \rk=' -6,9 s$\ C- License Engineer/ Architect Name: ASHFAQUE HUSSAIN ,t' Ashok Dhapg{}ar (NMC License No- L.57f y{ (Promoterf (N.I.T. License No- 2265f ^ M' Kolbaswami Awirat Construction Date - 31-03-2019 ,