JITENDRA INGULKAR ARCHITECT & ENGINEER ADD: Congress Nagar, Nagpur - 440012 Mob.: +91-9372300576 Email: jitendraingulkar9@gmail.com Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) Date: Lo-|o- 202S uarter Enoleel 30tn Seyp tember2025 To, BHARAT DEVELOPERS Nagpur, MAHARASHTRA.440010 Subject: Certificale of Cost Incurred for Development of LOTUS RESIDENCY having MahaRERA Registration Number P5050001 2602 (Only Apicable after project Registartion) being developed by BHARAT DEVELOPERS Sir, IWe Jitendra lngulkar have of Certilying Eslimated Cost for LOTUS RESIDENCY having MahaRERA Registration Number P50500012602 (Only Applicable after project Registration, being developed by BHARAT DEVELOPERS ) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the aparlments and proporionale complelion of internal &exlernal works of the project as per specificalions mentionedin agreements of sale.Our estimaledcost calculations are bassd on the drawings/plans made available to us for the projecl under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantily Surveyor' appoinled by Developer/Engineer, the assumption ofthe cost of material,labour and other inputsmade by developer,and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We eslimale Total estimaled the Cost ofcompletion of thc aforesaid project under reierence at Rs. 93820488.00 (Tolal ofTable Aand B) at the time of Registralion. The estimated Total Cost ofproject is with reference to thc Civil, MEP and Ailicd works required for completion of the apartments and proporlionate completion ofinternal&external works,as per specilicaions mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / complelion certilicate lor the Building(s) /Wing(s) Layout /Plotted Development from the Nagpur Improvement Trust being the Planning Authority under whose jurisidiction the aforesaid projecl is beng inplementcd. 4.The EstinatedCost incured till dale is calculatedal Rs. 49634489.00 (Total of Table Aand B).The amount of Estimaled Cost incurred is calculated on the basis of input materials/sorvices used and unil costof these items. 5. The Balanco Cost ofComplolion of the Civil, MEP and Allied works lor complelion of the apariments and proportionate Complition of nternal & cxternal works, as per spociticalion mentiOned in agreement of saBe, of the Page I of 4 Proect is estimated al Rs 44185997.00 (Tota! of Table A and B) proportionate ate internal & 6. icertify that the Cost of the Civil, MEP and allied works the for the apartments and Project as completed on the date exlernal works,as per specilication mentioned in agreement of sale, of the aforesaid of this certilicate is as given in Table Aand B below: Table-A Building/ Wing /Layout Plotled Development bearing Number :BUILDING A/NA Particulars Amount (in Rs.) Sr. No. 11727561.00 1 Total Estimaled Cost of the Building/Wing/Layout |Plotted Development as on date of Registration is 12408622.00 Cost incurred as on date of certificate |Work done in Percentage (as Percentage of the estimated cosl) 105.81 3 4 Balance Cost to be Incurred**(Based on Estimated Cost) -681061.00| Cost Incurred on the Additional/Extra items not included in the Esimaled Cost (Table-C) Building/ Wing/Layout Plotted Development bearing Number :BUILDING B/NA Particulars Amount (in Rs.) Sr. No. 11727561.00 1 Total Estimated Cost of the Building/Wing/Layout |Plotted Developmeni as on date of Registrationis 12408622.00 Cost incurred as on date of certificate 3 Work done in Percentace (as Percentage oí the estimaled cost) 105.81| -681061.00 Balance Cost to be Incurred'"(Based on Estimated Cost) 5 Cost Incurred on the Additional/Extra items not included in the Estimated Cost (Table-C) Building/ Wing /Layout Ploltled Development bearing Number :BUILDING C/NA Sr. No. Particulars Amount (!n Rs.) 1 Total Estimated Cost of the BuildingMWing/Layout 11727561.00 Plotted Development as on date of Registration is 2 Cost incurred as on date of cerlificate Work done in Percentage (as Percentage of the estimated cost) 4 Balance Cost to be Incurred**(Based on Estimated Cost) 11727561.00 5 Cost Incurred on the Additional/Extra items not included in the |Estimated Cost (Table-C) Buiiding/ VWing Layout Plotted Development bearing Number :BUILDING D/NA Sr. No. Particulars Amount (ln Rs.) 1 Total Estimated Cost of the Building/Wing/Layout 11727561.00 |Plolled Development as on date of Registration is 2 Cost incurred as on dale of certificate 3 |Work done in Percentage (as Percenlage of the estimated cost) 4 Balance Cost to be Incurred*"(Based on Estimated Cost) 11727561.00 Cost Incurred on the Additional/Extra ilems not included in he Estimated Cost (Table-C) Pago 2ct d Table B Internal and Extcrnai Devclopmnent Works in respcct of the Registered Phasc Sr. No. Particulars Amount (In Rs.) () Total Estimated Cost of thc Building/Wing/Layoul 46910242.00 1 Pioted Development as on dale of Registralion is 24817245.00 Cost inCurred as on date of certificate 52.90 Work done in Percentage (as percentage of the eslimated cost) Balance Cost to be Incurred'" (Bascd on Estimated Cost) 22092997.00 4 5 Cost Incurred on the Additional/Extra items not included in the |Estimated Cost (Tablc -C) Yours Faithfully JITENDRA INGULKAR (D.C.R.E.) NIT Reg. No.: 1714 JITENDRAING=KAR NMC Rey. No.: 557 Signature &Name (IN BLOCK LETTERS) with Slamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Scction 2(u) of thc Act] Local Authority license no. (if applicable) Date of Certificate: 9eeo&NGceied by RS Signature of fyomoiefTNER Name: BHARAT DEVELOPERS Date: |o-l0-2O 2S 1.The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2.(') Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor,whose certificate of In case of independent quantily surveyor being appointed by Developer, the name has to be mentioned at the place marked (') and in case quantity are being calculated by office of Engineer,the name of the person in the marked (). office of Engineer, who is responsible for the quantity calculated should be mentioned at the place 3.(*") Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to devialion in quantity reguired /escalation of cost etc. As this is an estimated cost., any deviation in quantity required for development of the Real Estale Project will result in amendment of the cost incurred /1o be incurred. 4.All componcnts ol work with specificalions are indicalive and not exhaustive 5.Plcase specily if there are any deviations / qualifications. Example: Any deviations in input material used from specilications in agreemenl of sale. Page 3 ol 4 TABLEC List oí ExiralAdditional/Delcled items considered in Cosl. (which were not part of the original Estimate of Tolal Cosl)