$ T LEUE iI orchitects & interior DESIGN CONSUTTANCY & CONIRACT EXECUIION DATE:30-06-2022 ARC HITECT'S CERTIFICATE To, Luxora lnfrastructures PW. Ltd. Unit No 150, Avior Corporate Park, Nirmal Galary, L.B.S. Road, Mulund (West), Mumbai - 400080 Subject: Certificate of Percentage of Completion of Construction Work of pARK MANSION 54 of the Project Ensaara Metropark'Which is Third phase" having MahaRERA Retistration Number P50500010625 being developed by Luxora tnfrastructure pvt Ltd. Sir, I/ we STUDIO ELEVEN have undertaken assignment as Architect /Licensed Surveyor of certifring Percentage of completion of construction work of PARK MANSION 54 of the Project Ensaara Metropark' which is Third Phase" having MahaRERA Registration Number. P50500010526 being developed by Luxora Infrastructure Pvt. Ltd. Based on Site Inspection, with respect to Layout / each of the Building /wing of the aforesaid Real Estate Project. I certifu that as on the date of tlis certificate, the percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity ofthe entire phase is detailed in Table plol no 61, shordo Nogor, hudkeshwor police slotion rood, neor vithobo lown, Nogpur 440034, www.studioeleven.in J EtIUTil orchitects & inlerior DESIGN CONSUI.TANCY & CONTRACT EXECUTION Table A BUILDING PARK MANSION s4: PERCENTAGE COMPLETION AS ON JUNE-2022 Sr.No Task / Activity Toage of Work Done 1 Excavation 1000h 2 Basement (if any) NA 3 Podium (if any) NA 4 Plinth 100% 5 Stilt Floor NA 6 RCC Superstructu re 1000 lnternal Wall, lnternal Plaster, Flooring with Flats/premises, door and 7 100% windows to each of the Flat/Premises. Sanitary Fitting within the Flats/ premises, Electrical Fitting within the a 6.44Yo Flats/Premises. Staircase Lift Well Lobby's at Each Floor Overhead & Under Ground 9 00 Water Tank. External Plumbing & External Plaster Elevation completion of terrace 10 62.690h with water proofing of building. lnstallation of lifts water pumps fire Fighting Fittings Equipment as per CFO NOC. Electrical Fittings, Common Area Electromechanical Equipment's, Compliances to condition of environment / CRZ NOC 11 18.04yo Finishing to entrance Lobby, Plinth Protection, paving of Areas appurt€nant to building/ wing common wall & other requirement as may be required to obtain occupation / Completion Certificate. plot no 61, shordo Nogor, hudkeshwor police slolion rood, neor vilhobo lown, Nogpur 440034, www.sludioeleven.in orchitects & interior * TITUIiI DESIGN CONSUlIANCY & CONTRACI EXECUTION Table B INTERNAL & EXTERNAL DEVELOPMENT IN RESPECT F ENTIRE RFGISTERED BUILDINGS : PEBCENT,A.GE C9MPLETION AS ON JUNE.2O22 Sr.No. Description %age of Work Done 7 lnternal Road & footpath 62.O8Yo 2 Water Supply 35.44Yo 3 Sewerage (Sewer lines and Chambers) 66.73yo 4 Strom Water Drain 66.73% 5 Land Scape & Tree Planting 80/o 6 Street Light LO% 7 Community Building (lncluding lnterior Work) 50% Treatment and disposal of sewage and sullage water too% 9 Solid waste management and disposal o% 10 Water conservation, rain water harvesting 0% 77 Energy management 0% L2 Fire protection and fire safety requirements o% 13 Electrical meter room, substation, receiving station 36.89Yo Your's Sincerely, For STUDIO ELf,VEN Ar. Sachin K' Kukade cN2007/3938s Architecl SACHIN K KUKADE cA/2007 /3938s Agree d and Accepted by : For Luxora Infrastructure Pvt Ltd Name : Umesh Patankar Date : 30 J:une 2022 plot no 61, shordo Nogor, hudkeshwor police slolion rood, neor vilhobo lown, Nogpur 440034, www.sludioeleven.in