.i E IEUE ]I orchitecls & inlerior DESIGN CONSUI.TANCY & CONIRACT EXECUTION DATE:31-12-2022 ARCHITECT'S CERTIFICATE To, Luxora lnfrastructures P\rt. Ltd. unit No 150, Avior Corporate Park, Nirmal Galaxy, L.B.S. Road, Mulund (Westl, Mumbai - 4OOo80 Subject: Certificate of Percentage of Completion of Construction Work of PARK MANSION 54 of the Proiect Ensaara Metropark' Which ls Third Phase" having MahaRERA Registration Number P5OsOOO10625 being developed by Luxora lnfrastructure Pvt Ltd. Sir, U We STIIDIO ELEVEN have undertaken assignment as Architect /Licensed Surveyor of ce(ifing Percentage of Completion of Construction Work of PARK MANSION 54 of the Project Ensaara Metropark' Which is Third Phase" having MahaRERA Registration Number. P50500010626 being developed by Luxora Infrastructure Pvt. Ltd. Based on Site Inspection, with respect to Layout / each of the Building /Wing of the aforesaid Real Estate Project. I Certiry that as on the date of this certificate, the Percentage of Work done for each ofthe building/Wing ofthe Real Estate Project under MahaRERA is as per Table A herein below. The percentage ofthe work executed with respect to each ofthe activity ofthe entire phase is detailed in Table plot no 61, shordo Nogor, hudkeshwor police stotion rood, neor vilhobo Iown, Nogpur 440034, www.siudioeleven-in .i E[EUEH Table A orchitects & interior DESIGN CONSUI.TANCY A CONTRACT EXECUTION BUILDING PARK MANSION 54: PERCENTAGE COMPLETION AS ON DEC-2022 Sr.No Task / Activity Toage of Work Done 1 Excavation 100% 2 Basement (if any) NA 3 Podium (if any) NA 4 P linth 100% 5 Stilt Floor NA 6 RCC Superstructure 1000h lnternal Wall, lnternal Plaster, Flooring with 7 Flatslpremises, door and windows to each of the 100% FlatlPremises. Sanitary Fitting within the Flats/ premises, Electrical 8 6.41.4 Fitting within the Flats/Premises. Staircase Lift Well Lobby's at Each Floor overhead & 9 0. Under Ground Water Tank. External Plumbing & External Plaster Elevation 10 62.69v" completion of terrace wath water proofing of building. lnstallation of lifts water pumps fire Fighting Fittings Equipment as per CFO NOC. Electrical Fittings, Common Area Electromechanical Equipment's, Compliances to condition of environment / CRZ NOC 11 18.0{% Finishing to entrance Lobby, Plinth Protection, paving of Areas appurtenant to buildin&/ wing common wall & other requirement as may be required to obtain occupation / completion certificate. plot no 61, shordo Nogor, hudkeshwor police stotion rood, neor vithobo lown, Nogpur 440034. www.siudioeleven.in J E[EU:t{ Table B INTERNAL & EXTERNAL DEVELOPMEM IN RESPECT OF'ENTIRE orchilecls & interior DESIGN CONSUIIANCY & CONTRACT EXECUI'ON RE ISTERED BUILDINGS : PERCENTAG MP TION AS ON DEC.2O22 Sr.No. Description %age of Work Done 1 lnternal Road & footpath 62.08% 2 Water Supply 3s.44% 3 Sewerage (Sewer lines and Chambers) 66.730/o 4 Strom Water Drain 66.13% 5 Land Scape & Tree Planting 80% 6 Street Light 10% 7 Community Building (lncluding lnterior Work) soo/o 8 Treatment and disposal of sewage and sullage water too% 9 Solid waste management and disposal o% 10 Water conservation, rain water harvesting 0% 11 Energy management 00/" 72 Fire protection and fire safety requirements 0% 13 Electrical meter room, substation, receiving station 36.89% Your's Sincerely, For STUDIO ELEVEN Archit€ct SACHIN K KUKADE qr s""hit$lff,:i cAlzOOT /3938s cN2007139385 Agreed and Accepted by : tfiiffin'*'3's385827 For Luxora Infrastructure Pvt Ltd Date : 3l Dec 2022 plot no 61, shordo Nogor, hudkeshwor police slolion rood, neor vilhobo lown, Nogpur 440034. www.sludioeleyen.in