$ LWI E TUDI IU orchitects & interior DESIGN CONSUTTANCY & CONTRACT EXECUTION DATE:30-09-2022 ARCHITECT'S CERTIFICATE To, Luxora lnfrastructures Pvt. l-td. Unit No 150, Avior Corporate park, Nirmal Galaxy, L.B.S. Road, Mulund (West), Mumbai- 4O0O8O subject: certificate of percentage of completion of construction work of pARK MANSIoN 54 of the Project Ensaara Metropark'which is Third phase" having MahaRERA Registration Number P50500010626 being developed by Luxora lnfrastructure pvt Ltd. Sir, v we sruDlo ELEVEN have undertaken assignment as Architect /Licensed surveyor of certifing Percentage of completion of construction work of pARK MANSION 54 of the Project Ensaara Metropark' which is Third phase" having MahaRERA Registration Number. P50500010626 being developed by Luxora Infrastructure pvt. Ltd. Based on Site Inspection, with respect to Layout / each of the Building /wing of the aforesaid Real Estate Project. I certifi that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table plol no 61, shordo Nogqr, hudkeshwor police slolion rood, neor vilhobo lown, Nogpur 440034, www.sludioeleven.in & Er3tftrr{ orchitects & interior :..:,.. ...,a,:.,,,, .,a, ::r:,:l:1. ]]i:. :llaiil,r. DESIGN CONSUI.TANCY & CONTRACT EX:CUTION Table A BUILDING PARJ< MANSI ON 54: PERCENTAGE COMPL ETION AS ON SEPT-2022 Sr.No Task / Activity %oage of Work Done 1 Excavation 100% 2 Basement (if any) NA 3 Podium (if any) NA 4 Plinth 100% 5 Stilt Floor NA 6 RCC Superstructure 100% lnternal Wall. lnternal Plaster. Flooring with Flats/premises, door and 7 100% windows to each of the FlatlPremises. Sanitary Fitting within the Flats/ premises, Electrical Fittiirg within the 8 6-4401" FtatslPremises. Staircase Lift Well Lobbls at Each Floor Overhead & Under Ground 9 00 Water Tank. External Plumbing & External Plaster Elevation completion of terrace 10 62.69yo with water proofing of huilding. lnstall ation of lifts water pumps fire Fighting Fittings Equipment as per CFO NOC. Electrical Fittings, Common Area Electromechanical Equipment's. Compliances to condition of environment / CRZ NOC 11 l8.04yo Finishing to entrance Lobby, Plinth protection, paving of Areas appurtenant to buildingl wing common wall & other requirement as may be required to obtain occupation / Completion Certificate. plot no 61. shordo Nogor, hudkeshwor police stolion rood, neor vithobo lown, Nogpur 440034. www.studioeleven.in $ EI.TUTil Table B orchitects & interior DESIGN CONSULIANCY INTERNAL & EXTERNAL D EVELOPMENT IN RESPECT O F ENTIRE t CONTRTACI EXECUTTON GIS BUILDIN s : PERCENT AGE COMPLETION A oN SEPT-2022 Sr.No. Description %age of Work Done 1 lnternal Road & footpath 62.08/o 2 Water Supply 35.44% 3 Sewerage (Sewer lines and Chambers) 66.73Yo 4 Strom Water Drain 66.73% 5 Land Scape & Tree Planting 80% 6 Street Light 1,0% 7 Community Building (lncluding lnterior Work) 50% a Treatment and disposal of sewage and sullage water r@% 9 Solid waste management and disposal o% 10 Water conservation, rain water harvesting 0% 11 Energy management OYo 72 Fire protection and fire safety requirements OYo 13 Electrical meter room, substation, receiving station 36.89% Your's Sincerely, ForSTUDIO ELEYEN Ar. Sachin K. Kukade Regd. Architect cA/2007/39385 NrT-2307 Architect SACHIN K KUKADE NMC/R-483 cA/2007 /39385 Agreed and by: For Luxora Infrastructure Ptt Ltd Name : Umesh Patankar Date: 30 Sept2022 plol no 61, shordo Nogor, hudkeshwor police stotion rood, neor vithobo lown, Nogpur 440034, www.studioeleven.in