UMESH LAMGE DESIGNER ARCHITECT & INTERIOR NAGPUR-15 DAYA CHAMBER, AJNI Sa, WARDHA ROAD, 402, larmge71@gmail.com E-rnail iD- Mobile No. 09822566554, Annexure A FORM 1 |See Regulation 3] ARCHITECT'S CERTIFICATE of Ongoing Project & for Withdrawal of (To be subrnitted at the tine of Registration Money from Designated Account) Por the Quarter April to June 2024 Date: -30/06/2024 To. The Tirupati Developers, 3rd Floor NKY Towers, AjaniSquare, Wardha Road, Nagpur - 440015 Subject - Certificate of Percentage of Completion of Construction Work of Dhanbhoomi1 having MahaRERA Registration Number P50500008320 being Developed by Tirupati Developers. Sir, IUrnesh Larmge have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Cormpletion of Constructíon Work of Dhanbhoomi 1 having MahaRERA Registration Number P50500008320 (Only applicable after Project Registration) being Developed by Tirupati Developers. Based on the Site Inspection, with respect to the Layout / each BuildingWing of the aforesaid Real Estate Project, Icertify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Tabie-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A Layout / Building / Wing Nurnber (to be prepared separately for each Layout/BuildingWing of Project) S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2) (3) 1 Excavation NA 2 Basernents (if any) NA 3 Podiums (if any) NA NA 4 Plinth NA 5 Stilt Floor NA 6 Slab of Super Structure NA 7 Internal Walls, Internal Plaster, Floorings, Doors, windows within Flats / Premises NA Sanitary Fittings within Flats /Premises NA Staircases, Lift Wells & Lobbies at each Floor Level Overhead and Underground Water Tanks NA 10. External Plumbing & External Plaster, Elevation, Completion of Terraces, with waterproofing of the Building / Wing NA 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingWing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity *Note: - The Above table is not applicable to our project since we are under Plotted Layout not Buiiding constructions. TABLE-B Common Areas (Internal &External Development Works) in respect of the Registered Phase / Project Number S Common Areas & Facilities Proposed Percentage of actual Work Details No. (Yes / NO) Done (As on date of Certificate) (1) (2) (3) (4) (5) 1. YES 100% As per NMRDA Internal Roads &Footpaths Norms 2 YES 100% As per NMRDA Water Supply Norms 3 Sewerage (Chamber, Lines, YES 100% As per NMRDA Septic Tank, STP) Norms 4 YES 100% As per NMRDA Strom Water Drains Norms 5 YES 100% As per NMRDA Landscaping &Tree Planting Norms 6. YES 100% As per NMRDA Street Lighting Norms 7 Community Buildings NA NA NA 8 Treatment Disposal of YES 100% As per NMRDA Sewage and Sullage Water Norms 9 Solid Waste Management & NA Disposal 10. Water Conservation YES 100% As per NMRDA Rainwater Harvesting Norms 11. Energy Management NA 12. Fire Protection & Fire Safety NA NA NA requirements 13. Electrical Meter Room, Sub YES 100% As per NMRDA Station, Receiving Station Norms 14 Others (Option to Add more) NA Yours fathfully. Umesh Moreshwar Lamge|ESH M. LAMGE Architect BArch. (Hons) License Number ( Reg No. CA/95/18907 NMCLic No.: R-90 NIT Lic No.: 865 Agreed &accepted by: Kiru Deve Tirupati,DÁvelopers Name:Pfashant Bongirwar Date: -30/06/2024 - ard Woor, NKY awer Ajni Square, Wardhe Road. NaRp: