UMESH LAMGE ARCHITECH & INTERIOR DESIGNER 402, DAYA CHAMBER, AJNI SQ., WARDHA ROAD, NAGPUR-15 Cell-09822566554, E-mail lamge71@gmail.com CERTIFICATE To, Date-05/07/2022 Tirupati Developers, Third Floor, NKY Tower, Ajani Square, Nagpur. This is to certify that the Percentage of Completion of Development Works of the Project (MahaRERA Registration Number: P5O500008330) Situated on the Plot bearing Khasra No.- 32/1, 32/2, demarcated by its boundaries (latitude and longitude of the end points) Boundaries of 32/1, 32/2- East 18.00 M. Wide Roa West Adj. Kh. No. 31, Adj. Kh. No. 33 North-Government Forest South-Proposed 24.00 M. Wide R.P. Road of Division- Nagpur, Mouza - Dongargaon (Bori), P.H.No.- 76, Taluka - Nagpur (Gramin), District Nagpur, admeasuring 66720.14 Sq.m. area being developed by Tirupati Developers. Sir, ,Umesh Lamge have taken undertaken assignment as Architect Certifying Completion of Development works on the plot bearing Kh.No. 32/1, 32/2, P.H.No. 76, Mouza Dongargaon (Bori), Taluka Nagpur (Gramin), District Nagpur, admeasuring 66720.14 Sq.m. area being developed by Tirupati Developers Following technical professionals are appointed by Owner/ Promoter: I. Shri. Umesh Lamge As L.S./ Architect: Shri. Mahesh Balpande As Civil Engineer. Based on site inspection, I certify that as on the date of this certificate. The percentage of the work executed with respect to each of the activity of the Real Estate Project as registered vides NO.(--).Under MahaRERA of the entire phase is detailed in Table B. Table-B entire registered Phase Internal and External Development Works in Respect of the Percentage Details Common areas and Facilities, Proposed S.No. of work done AmenitiesS (Yes/ No) Yes 100% 1 Internal roads Yes 100% 2 Water supply Yes 95% Sewerage (chamber, lines, Septic tank.STP) Yes 100% 4 Storm water drains Yes 100% Tree planting Yes 0.0% Street lighting No 0.0% Community buildings Treatment and disposal of Yes 0.0% 8 water sewage and sullage Waste Water Recycling Plant Yes 0.0% Water conservation, Rain water Yes 100% 10 harvesting No 0.0% 11 Energy management Fire protection and fire safety No 0.0% 12 requirements Sub-station, receiving station Yes 0.0% 13 Yes 100% 14 Area of the open space Yours Faithfully UMESH M. LA RArrh ns) ARCHITECTS RogNa NMC LIC Na NIT LIC N