Archltect, Planner, Landscape Archltect, lnterlor vtsTMR HEtcHTS, 4rh floor, plot No. 146_151, Zenda Chowk, ,9422LO3220, Annexure A FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing project and for withdrawal of Money from Designated Account) Date- 3t/03/2024 To, M/S TECHOPS INFRASTRUCTURE PVT LTD, PIOT NO. 11 & 12, AYODHYA NAGAR SAKKARDHARA NEAR SUDHANSHU HALL, NAGPUR,44OO24 subject: certificate of percentage of completion of construction work ,,TEcHops of GARDEN" having MahaRERA RegistrationNo. p 50500008242 being developed by TECHOpS INFRASTRUCTURE PVT LTD siml, District - Na qr-Pin-440023 Sir, l,c'D.Giripunje have undertaken assignment as Architect/ Licensed surveyor of certifying Percentage of completion of Construction work of "TEcHops GARDEN"having MahaRERA Registration NoPlQSoqgg824zbeing deveroped bvTEcHops rNFRAsrRUcruRE pw LTD Based on site rnspection, with respect to Layout / each of the Buirding /wing of the aforesaid Real Estate Project, I ce rtify that as on the date of this ce rtificate, the percentage of work doneforeachof the Building /wing of theReal Estate project under MahaRERA isasperTableA herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. EXCEPT WING N 1 lnternal Roads and Footpaths YES 700% As sanctioned by NtT 2 Water Supply YES tol% As sanctioned by NIT 3 Sewerage (Chamber, lines, YE5 700% As sanctioned by NIT Septic Tank, STP) 4 Storm Water Drains YES LOO% As sanctioned by NtT 5 Landsca ping and Tree planting YES 700% As sanctioned by NIT 6 Street Lighting YES 100% As sanctioned by NIT 7 Community Buildlngs YES LOO% As sanctioned by NIT 8 I rearment and disposal of NO NA sewage and sullage water 9 Solid waste management and NO NA Disposal 10 Water conservation/Rainwater YES too% As sanctioned by NIT harvesting 11 Energy management NO NA t2 Fire protection and fire safety YES LOO% As sanctioned by NIT requirement 13 Electrical Meter Room, Sub- YES !@Yo As sanctioned by Station, Receiving Station MSEB r4 Open Parking YES 700% As Sanctioned by NIT 15 Aggregate Area of recreational YES LOO% As Sanctioned by NtT Open Space t6 Other (option to add more) Note: The Proiect is tOO * .o.p,"a years. Company proposes to surrender the RERA No asap , . Yours fa ithfully, . i1c.1321 Date:31/03/2O24