AVINASH HAJARENGINEER CIVIL ARCHITECT AND CONSULTING 440024. Nagpur- 7020789358 Plot No, 30S, New Subedar Layout, 9422146765, NIT LIC No, 2490 Mob. No. Date : Ref. No, Annexure 8 FORM-2 Moneyfrom ENGINEER'SCERTIEICATE withdrawalof Project andfor Ongoing tìme of Registration of projectwise) (To be submitted atthe DesignatedAccount- Date-31/12/2024 TO INFRASTRUCTUREPVT LTD, M/S TECHOPS SAKKARDHARA 11 & 12, AYODHYA NAGAR PLOT NO. NAGPUR, 440024 MahsRERA HALL, GARDEN"having NEAR SUDHANSHU DevelopmentofTECHOPS INERASTRUCTUREPVT LTD, lncured for M/STECHOPS (sim), District of Cost Subject-Certificate 505S0000S242 beingdeveloped by 6/4of Village- Gonhi RegistrationNo P 6/3, Bearing Khasara No, 6/1, 6/2, situated At Plot Nagpur-Pin-440023. Estimated Cost Undertaken Assignment of certifying PS05000OSZ428eing Sir, for"TECHOPSAVINASH HAJARE have GARDEN"havingMahaRERA Registration No, 1. We, ENG. INERASTRUCTURE PVTLTD, DevelopmentBy M/S TECHOPS completion of the required for MEP and allied works project as estimated the cost of Chil, intermal& extemal workS of the 2. We have proportionate completion of estimated cOst calculations are based on apartments and agreement ofsale. Our developers specificationsmentioned in for the project under reference by the as made available to us for the entire work the drawings/plans quantity required schedule of items and ofthe cost of and consultants. The appointed by Developer/Engineer, the assumption calculated by surveyor inspection carried out by inputs made by developer, and the site material, labor and other above analysis given to us. us to ascertain/contirm the reference as Rs Estimated Cost completion of the aforesaid project under 3. We estimate Total Registration. The estimated Total Cost 116,50,00,000/-(total of table Aand B)at the time of completion of reference to the Civil, MEP and Allied works required for the of project is with works,as per apartments and proportionate completion of internal & external the the purpose of obtaining occupation specifications mentioned in agreement of sale and for Layout/Plotted Development certificate/completion certificate for the Building(s)/ Wings/ jurisdiction the aforesaid project is from theNITbeing the Planning Authority under whose being implemented. AVINASH HAJARENGINEER ARCHITECT AND CONSULTING CIVIL Nagpur- 440024. Plot No. 308, New Subedar Layout, 9422146765, 7020789358 NIT LIC No. 2490 Mob. No. Date : Ref. No. (Table Aand 000/-Total of input calculated at Rs 113,00,00, the basis of 4. The Estimated Cost incurred till date is Incurred is calculated on B). The amount of Estimated Cost materials/services used and unit cost of these items completion of Rs for the as Allied works external works Civil, MEP and internal & Rs.(Total of 5. The Balance Cost of Completion ofthe proportionate completion of estimated at 3,50,00,000/- the apartmentsand ofthe project is agreement of sale, perspecifications mentioned in Table Aand B). proportiolate apartments and sale MEP and allied work for thementioned in agreement of the Civil. that the Cost of perspecifications as given in Table A O TCertity external works as certificate is completion of internal & completed on the date of this project as OT the aforesaid and Bbelow: TABLE-A orcalled bearing Number the Real Building/Wing/Plotted Development /Layout/ Plotted Development of Building/Wing prepared separatelyfor each (To be EstateProject) Amount (InRs) Particulars Sr. No. Building/Wing /Layout/ 1 Total Estimated cost of the Plotted Development As on 15/02/2020 Date of Registration is Cost incurred as on 2 (based on the Estimated cost) for Wing 'N 3 Work done in Percentage Except estimated cost) (as Percentage of the Balance Cost to be incurred (Based on Estimated Cost) Rs. -------0- 5 Cost Incurred on Additional / Extra Items As on Not included in The Estimated Cost (Table -C) AVINASH ARCHITECT AND HAJARE NGINEER CIVIL CONSULTING Plot No. 308, New Subedar Layout, Nagpur- 440024. NIT LIC No. 2490 7020789358 Mob, No. 9422146765, Dato Ref. No. TABLE-D Phase Works In Respect of The Registered Internal& External Development Amount(In Rs) St. No. Particulars 116,50,00,000/ TotalEstimated cost of the Internal and External Facillties in Development Works including amenitles and the layout as on 02/06/2023 date of reistration is 15/02/2020 113,00,00,000/ Cost incurred as on 31/12/2024 (based on the Estimated cost) 96.99% Work done in Percentage cost) (as Percentage of the estimated 3,50,00,000/ Balance Cost to be incurred (Based on Estimated Cost) Extra Items Cost incurred on Additional/ Cost ( Table As on not included in the Estimated C) plan to construct after 5 to 7 complete except WINGN which they Note: Th¡ Prafect is 100% surrender the RERA No asap years. Conpy poposes to ENGAVIASH HAJARE Bonsliae C Ergher Agreed and Accepted by: TECHOPS INERASTRUCTURE PVT LTD, Mr Jeevan Ghime Direçtor Dete:31/12/2024 AVINASH HAJARENGINEER CIVIL ARCHITECT AND CONSULTING 440024. Nagpur - Plot No. 308, New Subedar Layout, 7020789358 94221467T65,. NIT LIC No. 2490 Mob. No. Date : approved Ref.: drawing Project as per 1. The scope of work is to complete Registered Real Estate agreementof sale. independent from time to time as per specifications mentioned in done by an 2. (") Quality survey can be done by office of Engineer or can be upon by the calculated can be relied developer, Quality Surveyor, Whose certificate or quantity being appointed by the developer, the Surveyor Engineer. In case of independent quantity appointed by the being beingcalculated engineer. In case of independent quantity surveyorand in case quantityare responsible marked(*) Engineer, whois name has to be mentioned at the place office of the by office of Engineer, the name ofthe person in marked("). calculated should be mentioned at the place Total estimated Cost for the quantity ca between from Difference /escalation of cost etc. 3. **) Balance Cost to be incurred (4) may vary required deviationin quantity of the Real (1) and Actual Cost incurred (2) due to quantity required for development As this is an estimated Cost. any deviation in incurred. will result in amendment of thecost incurred/ to be EState Project with specifications are indicative and not exhaustive. 4. All components of work deviations in input any deviations/ qualifications. Example: Any are J. Pease specify if there in agreement of sale. material used from specifications TABLE C considered in Cost. List of Extra/Additional/Deleted Items Cost) (Which were not part of the original Estimate of Total List Of Extra/Additional/Deleted Items Amount (In Rs) Sr. No. 1 2 ENG- AVINASH HAJARE (LICENSE NO-) Dstg Chi Enginoer NTL0. 2490