Building Name - GOVINDAM APARTMENT Sr. No. Tasks/Activity Percentage of Work Done t Excavation 100% 2 Number of Basement(S) and Plinth - 2 tol% 3 Number of Podiums - 1 100% 4 Stilt Floor - 1 too% 5 Number of Slabs of Super Structure - 14 100% 5 lnternal Walls, lnternal Plaster, Flooring within 70% Flats/Premises, Doors and Windows to each the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 50% Electrical Fittings within the FIat/Premises 8 Staircase, Lift Wells and Lobbies at each Floor LOl% Level connecting Staircases and Lifts, Overhead and Underground Water Tanks , 9 The External Plumbing and external plaster, too%, Elevation, completion of Terraces with waterproofing of the Building/Wing 10 lnstallation of Lifts, Water Pumps, Fire Fighting o% Fittings and Equipments as per CFO NOC, Electrical Fittings to Common Areas, Electro Mechanical Equipment, Compliance to conditions of Environment/CRZ NOC, Finishing to entrance Lobby/s, Paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation/Com pletio n Certificate