WATER SUPPLY : Corporation and Well water through common underground water sump. 10) ELECTRIFICATION : Concealed copper wiring in PVC conduits with modular Switches (Wires make - R.R Cable & / Polycab). (Switches make Hager Schneider / Panasonic or Equivalent. 11) LIFT Two 10 passengers automatic doors V3F machine room less Lift in each wing (Total 4 nos. Of Lift ). Of Schindler made . 12) SITE DEVELPOM ENT: Paving of concrete Blocks / Trimix concrete Floor and Landscape with sprinkler system. 13) PLUMBTNG All drainage Lines of C.t pipe. All water lines shall Be of CPVC & UPVC pipes of Ashirwad / Astral make. All Balcony, Landing rainwater downtake Pipes shall be of SWR of Ashirwad/ Astral make. L4) HOT WATER Common Solar heated water shall be provided to all bathrooms excluding kitchen & powder room. 1s) KTTCHEN Kitchen otta in granite with double bowl sink with drainboard of Nirali make having ceramic / vitrified dado of 2 ft height. 16) SURVEILLANCE SYSTEM: Remote entrance gate & video door phones surveillance system with 15 days back up with about 30 CCTV monitoring the movement in corridors. 17) PODTUM GARDEN : Around 10000 Sq. Ft. of Podium Terrace Garden with swimming pool & kids pool with Children play area and Chit Chat zone and Green landscaping with sprinkler system. 18) PARKING i One alloted car parking per flat and also 2 nos of Two wheeler and 2 nos of Cycle parking to be alloted per flat the area of which will be equivalent to accomodate an extra car. l" WJ,"'l