VIS.TAAR Architect, Planner, Landscape Architect, Interior Deslgner, (over Va Mandit Vistoar Helghts, 4h floor, Plot No.146-151,Opp. Shres Gajanan Mahato)ts Zanda Chowk, Dharartpeth, NAGPUR10," M,NO-2103220 Annexure A FORM 1 ARCHITECT'SCERTIFICATE (To be submitted at the timeof Registration of Ongoing Project and for withdrawal of Money frorm Deslgnated Account) Date- 31/12/2024 To, M/S TECHOPS INFRASTRUCTURE PVT LTD, PLOT NO. 11 &12, AYODHYA NAGAR SAKKARDHARA NEAR SUDHANSHU HALL, NAGPUR, 440024 Subject: Certificate of Percentage of Completion of Construction Work of "TECHOPS GARDEN" having MahaRERA ReglstrationNo. P 50500008242_being developed by TECHOPS INFRASTRUCTURE PVT LTD,Plot Bearing Khasara No. 6/1, 6/2,6/3, 6/4 of VIllage-Gonhi (sim), District - Nagpur-Pin- 440023 Sir, , ARC. C.D. GIRIPUNJE have undertaken assignment as Architect/ Licensed Surveyor of certifying Percentage of Completion of Construction work of "TECHOPS GARDEN"having MahaRERA Registration NoP 50500003242 beingdeveloped by TECHOPS INFRASTRUCTURE PVT LTD. Based on Site Inspection, with respect to Layout / each of the Building /Wing of the aforesaid RealEstate Project, Icertify that as on the date of this certificate, the Percentage of Work done for each of the Building /Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE- A Layout/bulldlng/wlng number (o be prepared separately fer each layout/ Bulldlng Wing of the project) / Sr. No, Task /activity (1) (2) Percentage of Actual Workdone (As On 31/12/2024) ExCavation EXCEPT WING N Basentents (if any ) 100% 100% Podiunns( f any) Plinth 100% Stilt floor 100% 6 100% Slabs of super structure 7 100% Internal walls, Internal plaster, Floorings, Doors and Windows withln 100% Flat/Prenmises. Sanitary fitting within the Flat/Premises 100% Staircases, Lift Wells, and Lobbies at each Floor Level Overhead and 100% Underground Water Tanks. 10 External plumbing and external plaster, elevation, completlon of 100% terraces with the waterprooflng of the BuldingWing 11 Installations of Lifts, water pumps, Fire Fighting Fitting and Equipment 100% as per CFO NCO, Electrical fitting, mechanical equipment, compliance to condition of environment/CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing. Compound Walland all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other activities. TABLE- B Common Areas (Internal and External Development Works) in respect of the Registered Phase/Project Number Sr. No. Common area and Facilities Proposed Percentage of Details (1 (Yes/No) Actual Work (5) (2) (3) Done (As On 31/12/2024) EXCEPT WING N 1 100% Internal Roads and Footpaths YES As sanctioned by NIT 2 3 Water Supply YES YES 100% 100% As sanctioned by NIT Sewerage (Chamber, lines, As sanctioned by NIT Septic Tank, STP) Storm Water Drains YES 100% As sanctioned by NIT Landscaping and Tree Planting YES 100% As sanctioned by NIT 6 Street Lighting YES 100% As sanctioned by NIT 7 Community Buildings YES 100% As sanctioned by NIT Treatment and disposal of NO NA sewage and sullage water Solid waste management and NO NA Disposal 10 Water conservation/Rainwater YES 100% As sanctioned by NIT harvesting 11 Energy management NO 0% 12 Fire protection and fire safety YES 100% As sanctioned by NIT requirement 13 Electrical Meter Room, Sub YES 100% As sanctioned by Station, Receiving Station MSEB 14 Open Parking YES 100% As Sanctioned by NIT 15 Aggregate Area of recreational YES 100% As Sanctioned by NIT Open Space 16 Other (option to add more) Note: The Project is 100 %complete except WING Nwhich they plan to construct after 5to 7 years. Company proposes to surrender the RERA No asap Yours faithfully, ARC. C. D. GIRIPUNJE (LICENSE NO ARQHITECT Agreed and Accepted by: C.D. Giripunje TECHOPS INFRASTRUCTURE PVT LTDC.A./2001/27832 N.I.T. No.1321 N.M.C. No.R-198 Mr Jeevan Ghime Director Date:31/12/2024 ACTIVITY DETAILS SR NO. ACTIVITY WINGS A B C D E F G H I J K L M N 1 EXCAVATION 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 2 PLINTH 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 3 PODIUM NA NA NA NA NA NA NA NA NA NA NA NA NA NA 4 STILT FLOOR 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 5 NO. OF SLABS 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 6 BRICK WORK, PLASTER,FINISHING 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 7 SANITERY/ELEC- TRICAL/FITTINGS 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 8 LIFTWELL 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 9 STAIRCASE 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 10 SUMP 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 11 OVER HEAD 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% WATER TANK 12 EXTERNAL WORK 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 13 INSTALLATION OF ALL MACHINERIES 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 14 OVERALL PERCENTAGE 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0%