20 01 5 leulated by offhce of Engineer, the name of the person in the office of Engineer, who isresponsiblefor the quantity calculated should be mentioned at the place marked () 2 (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated cost (1) and Actual Cost incurred (2) due to deviation in quantity of cost etc. As this estimated cost, any deviation in quantity required /escalation required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4. Allthe components of work with specifications are indicative and not exhaustive. 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in agreement of sale. Table C List of Extra / Additional / Deleted Items considered in Cost Cost) (Which were not part of the original estimate of Total List of Extra/ Amount (In Rs.) Sr. No. Additional/ Deleted Items NIL